Tunnel boring machine performance prediction in tropically weathered granite through empirical and computational methods
Many works highlight the use of effective parameters in Tunnel Boring Machine (TBM) performance predictive models. However, there is a lack of study considering the effects of tropically weathered rock mass in these models. This research aims to develop several models for predicting Penetration Rate...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/77893/1/DanialJahedArmaghaniPFKA2015.pdf http://eprints.utm.my/id/eprint/77893/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94622 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |