Safety budgeting cost for construction project

The safety performance of a building site varies with the amount of safety investment in the project. In general, the higher the safety investment, the better the safety performance will be and vice versa. The weakness of the current bidding system is that a contractor who bids for a project emphasi...

Full description

Saved in:
Bibliographic Details
Main Author: Abd. Latib, Firdaus
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/78143/1/FirdausAbdLatibMFKA20141.pdf
http://eprints.utm.my/id/eprint/78143/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:79337
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.78143
record_format eprints
spelling my.utm.781432018-07-25T08:17:45Z http://eprints.utm.my/id/eprint/78143/ Safety budgeting cost for construction project Abd. Latib, Firdaus TA Engineering (General). Civil engineering (General) The safety performance of a building site varies with the amount of safety investment in the project. In general, the higher the safety investment, the better the safety performance will be and vice versa. The weakness of the current bidding system is that a contractor who bids for a project emphasize on estimating for major items only to lowers their price. This system will have an impact on the safety budgeting. The aim of this study is to evaluate safety budgeting cost regarding safety and health features for building construction project. The objectives of this study are to identify the term and condition in contract document which defines or specified about safety and health requirement and to describe the work breakdown structure as well as to quantify the cost of safety and health feature's element of work in a work breakdown structure. A total of seven contract document has been collected from several companies and a case study was conducted on a multi storey building in order to evaluate safety budgeting features. The findings show that most of the contract documents put little emphasis on safety budgeting. The Work Breakdown Structure for this project consist of basement and superstructure works, swimming pool and pool deck, external works and nominated sub-contractor works. Through the case study, the safety budgeting cost for the project was found to be RM905,373.00, amounting to 1.67% of the contract value RM54,000,000.00. In order to ensure that occupational safety and health is properly implemented, safety needs must at first be included in the budget. This can be achieved by making it as a permanent feature in the contract document bills of quantity. 2014-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/78143/1/FirdausAbdLatibMFKA20141.pdf Abd. Latib, Firdaus (2014) Safety budgeting cost for construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:79337
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Abd. Latib, Firdaus
Safety budgeting cost for construction project
description The safety performance of a building site varies with the amount of safety investment in the project. In general, the higher the safety investment, the better the safety performance will be and vice versa. The weakness of the current bidding system is that a contractor who bids for a project emphasize on estimating for major items only to lowers their price. This system will have an impact on the safety budgeting. The aim of this study is to evaluate safety budgeting cost regarding safety and health features for building construction project. The objectives of this study are to identify the term and condition in contract document which defines or specified about safety and health requirement and to describe the work breakdown structure as well as to quantify the cost of safety and health feature's element of work in a work breakdown structure. A total of seven contract document has been collected from several companies and a case study was conducted on a multi storey building in order to evaluate safety budgeting features. The findings show that most of the contract documents put little emphasis on safety budgeting. The Work Breakdown Structure for this project consist of basement and superstructure works, swimming pool and pool deck, external works and nominated sub-contractor works. Through the case study, the safety budgeting cost for the project was found to be RM905,373.00, amounting to 1.67% of the contract value RM54,000,000.00. In order to ensure that occupational safety and health is properly implemented, safety needs must at first be included in the budget. This can be achieved by making it as a permanent feature in the contract document bills of quantity.
format Thesis
author Abd. Latib, Firdaus
author_facet Abd. Latib, Firdaus
author_sort Abd. Latib, Firdaus
title Safety budgeting cost for construction project
title_short Safety budgeting cost for construction project
title_full Safety budgeting cost for construction project
title_fullStr Safety budgeting cost for construction project
title_full_unstemmed Safety budgeting cost for construction project
title_sort safety budgeting cost for construction project
publishDate 2014
url http://eprints.utm.my/id/eprint/78143/1/FirdausAbdLatibMFKA20141.pdf
http://eprints.utm.my/id/eprint/78143/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:79337
_version_ 1643657740607815680