An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables

In this paper, we present an investigation into using fuzzy methodologies to guide the construction of high quality feasible examination timetabling solutions. The provision of automated solutions to the examination timetabling problem is achieved through a combination of construction and improvemen...

Full description

Saved in:
Bibliographic Details
Main Authors: Asmuni, Hishammuddin, Burke, E. K., Garibaldi, J. M., McCollum, B.
Format: Article
Language:English
Published: Elsevier 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/7848/3/HishammudinAsmuni2009_AnInvestigationOfFuzzyMultipleHeuristicOrderings.pdf
http://eprints.utm.my/id/eprint/7848/
http://dx.doi.org/10.1016/j.cor.2007.12.007
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.7848
record_format eprints
spelling my.utm.78482017-10-23T06:39:06Z http://eprints.utm.my/id/eprint/7848/ An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables Asmuni, Hishammuddin Burke, E. K. Garibaldi, J. M. McCollum, B. QA76 Computer software In this paper, we present an investigation into using fuzzy methodologies to guide the construction of high quality feasible examination timetabling solutions. The provision of automated solutions to the examination timetabling problem is achieved through a combination of construction and improvement. The enhancement of solutions through the use of techniques such as metaheuristics is, in some cases, dependent on the quality of the solution obtained during the construction process. With a few notable exceptions, recent research has concentrated on the improvement of solutions as opposed to focusing on investigating the ‘best’ approaches to the construction phase. Addressing this issue, our approach is based on combining multiple criteria in deciding on how the construction phase should proceed. Fuzzy methods were used to combine three single construction heuristics into three different pair wise combinations of heuristics in order to guide the order in which exams were selected to be inserted into the timetable solution. In order to investigate the approach, we compared the performance of the various heuristic approaches with respect to a number of important criteria (overall cost penalty, number of skipped exams, number of iterations of a rescheduling procedure required and computational time) on 12 well-known benchmark problems.We demonstrate that the fuzzy combination of heuristics allows high quality solutions to be constructed. On one of the 12 problems, we obtained lower penalty than any previously published constructive method and for all 12 we obtained lower penalty than when any of the single heuristics were used alone. Furthermore, we demonstrate that the fuzzy approach used less backtracking when constructing solutions than any of the single heuristics. We conclude that this novel fuzzy approach is a highly effective method for heuristically constructing solutions and, as such, has particular relevance to real-world situations in which the construction of feasible solutions is often a difficult task in its own right. Elsevier 2009-04 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/7848/3/HishammudinAsmuni2009_AnInvestigationOfFuzzyMultipleHeuristicOrderings.pdf Asmuni, Hishammuddin and Burke, E. K. and Garibaldi, J. M. and McCollum, B. (2009) An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables. Computers & Operations Research, 36 (4). pp. 981-1001. http://dx.doi.org/10.1016/j.cor.2007.12.007 10.1016/j.cor.2007.12.007
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic QA76 Computer software
spellingShingle QA76 Computer software
Asmuni, Hishammuddin
Burke, E. K.
Garibaldi, J. M.
McCollum, B.
An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
description In this paper, we present an investigation into using fuzzy methodologies to guide the construction of high quality feasible examination timetabling solutions. The provision of automated solutions to the examination timetabling problem is achieved through a combination of construction and improvement. The enhancement of solutions through the use of techniques such as metaheuristics is, in some cases, dependent on the quality of the solution obtained during the construction process. With a few notable exceptions, recent research has concentrated on the improvement of solutions as opposed to focusing on investigating the ‘best’ approaches to the construction phase. Addressing this issue, our approach is based on combining multiple criteria in deciding on how the construction phase should proceed. Fuzzy methods were used to combine three single construction heuristics into three different pair wise combinations of heuristics in order to guide the order in which exams were selected to be inserted into the timetable solution. In order to investigate the approach, we compared the performance of the various heuristic approaches with respect to a number of important criteria (overall cost penalty, number of skipped exams, number of iterations of a rescheduling procedure required and computational time) on 12 well-known benchmark problems.We demonstrate that the fuzzy combination of heuristics allows high quality solutions to be constructed. On one of the 12 problems, we obtained lower penalty than any previously published constructive method and for all 12 we obtained lower penalty than when any of the single heuristics were used alone. Furthermore, we demonstrate that the fuzzy approach used less backtracking when constructing solutions than any of the single heuristics. We conclude that this novel fuzzy approach is a highly effective method for heuristically constructing solutions and, as such, has particular relevance to real-world situations in which the construction of feasible solutions is often a difficult task in its own right.
format Article
author Asmuni, Hishammuddin
Burke, E. K.
Garibaldi, J. M.
McCollum, B.
author_facet Asmuni, Hishammuddin
Burke, E. K.
Garibaldi, J. M.
McCollum, B.
author_sort Asmuni, Hishammuddin
title An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
title_short An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
title_full An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
title_fullStr An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
title_full_unstemmed An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
title_sort investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables
publisher Elsevier
publishDate 2009
url http://eprints.utm.my/id/eprint/7848/3/HishammudinAsmuni2009_AnInvestigationOfFuzzyMultipleHeuristicOrderings.pdf
http://eprints.utm.my/id/eprint/7848/
http://dx.doi.org/10.1016/j.cor.2007.12.007
_version_ 1643644864958562304