Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan
As a consequence of energy crisis and pollution around the globe, many countries are shifting towards the renewable energy resources which are environmental friendly too i.e., solar energy. The aim of this research work is to design a solar powered geyser that can be used for domestic as well as for...
Saved in:
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Serbian Society of Heat Transfer Engineers
2018
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/79963/1/ShamraizAhmad2018_DesignandPerformanceAnalysisofHybrid.pdf http://eprints.utm.my/id/eprint/79963/ http://dx.doi.org/10.2298/TSCI180311299E |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.79963 |
---|---|
record_format |
eprints |
spelling |
my.utm.799632019-01-28T07:02:30Z http://eprints.utm.my/id/eprint/79963/ Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan Elahi, H. Tamoor, A. Basit, A. Israr, A. Swati, R. F. Ahmad, S. Ghafoor, U. Shaban, M. TJ Mechanical engineering and machinery As a consequence of energy crisis and pollution around the globe, many countries are shifting towards the renewable energy resources which are environmental friendly too i.e., solar energy. The aim of this research work is to design a solar powered geyser that can be used for domestic as well as for industrial purposes. The analytical model is constructed to understand the behavior of water temperature with respect to time and to the energy that can be generated from solar panel with and without glass glazing. The extensive experimentation was carried out at self designed test rig in Islamabad, Pakistan for six months i.e., Aug 2017 - Jan 2018. The response of the power output to the time in specific month and its efficiency is predicted and optimized. Moreover, electrical backup was integrated in closed loop feedback circuit to achieve maximum efficiency even in dark cloudy weather or a sunny day. Moreover, it is calculated that how much external power is required by the system in order to perform the task at different time intervals of the day. Analytical results were in good agreement with experimental results, with error of 9%. Serbian Society of Heat Transfer Engineers 2018 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/79963/1/ShamraizAhmad2018_DesignandPerformanceAnalysisofHybrid.pdf Elahi, H. and Tamoor, A. and Basit, A. and Israr, A. and Swati, R. F. and Ahmad, S. and Ghafoor, U. and Shaban, M. (2018) Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan. Thermal Science, 2018 . ISSN 0354-9836 http://dx.doi.org/10.2298/TSCI180311299E DOI:10.2298/TSCI180311299E |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Elahi, H. Tamoor, A. Basit, A. Israr, A. Swati, R. F. Ahmad, S. Ghafoor, U. Shaban, M. Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan |
description |
As a consequence of energy crisis and pollution around the globe, many countries are shifting towards the renewable energy resources which are environmental friendly too i.e., solar energy. The aim of this research work is to design a solar powered geyser that can be used for domestic as well as for industrial purposes. The analytical model is constructed to understand the behavior of water temperature with respect to time and to the energy that can be generated from solar panel with and without glass glazing. The extensive experimentation was carried out at self designed test rig in Islamabad, Pakistan for six months i.e., Aug 2017 - Jan 2018. The response of the power output to the time in specific month and its efficiency is predicted and optimized. Moreover, electrical backup was integrated in closed loop feedback circuit to achieve maximum efficiency even in dark cloudy weather or a sunny day. Moreover, it is calculated that how much external power is required by the system in order to perform the task at different time intervals of the day. Analytical results were in good agreement with experimental results, with error of 9%. |
format |
Article |
author |
Elahi, H. Tamoor, A. Basit, A. Israr, A. Swati, R. F. Ahmad, S. Ghafoor, U. Shaban, M. |
author_facet |
Elahi, H. Tamoor, A. Basit, A. Israr, A. Swati, R. F. Ahmad, S. Ghafoor, U. Shaban, M. |
author_sort |
Elahi, H. |
title |
Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan |
title_short |
Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan |
title_full |
Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan |
title_fullStr |
Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan |
title_full_unstemmed |
Design and performance analysis of hybrid solar powered geyser in Islamabad, Pakistan |
title_sort |
design and performance analysis of hybrid solar powered geyser in islamabad, pakistan |
publisher |
Serbian Society of Heat Transfer Engineers |
publishDate |
2018 |
url |
http://eprints.utm.my/id/eprint/79963/1/ShamraizAhmad2018_DesignandPerformanceAnalysisofHybrid.pdf http://eprints.utm.my/id/eprint/79963/ http://dx.doi.org/10.2298/TSCI180311299E |
_version_ |
1643658343824228352 |