Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/81429/1/SawPingLihMFKM2016.pdf http://eprints.utm.my/id/eprint/81429/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:120279 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |