Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant

In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...

Full description

Saved in:
Bibliographic Details
Main Author: Saw, Ping Lih
Format: Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81429/1/SawPingLihMFKM2016.pdf
http://eprints.utm.my/id/eprint/81429/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:120279
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English