An assessment tool for monitoring project performance
In the past, p roductivity assessment and performance evaluation were carried out separately due to cost constraints. Performing both simultaneously could significantly improve a project monitoring system. The appropriate use of schedule compression methods to accelerate the work at hand will reduce...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Civil Engineering, Universiti Teknologi Malaysia
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/8151/1/8151.pdf http://eprints.utm.my/id/eprint/8151/ http://web.utm.my/ipasa/images/stories/MJCE/2006/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |