An assessment tool for monitoring project performance

In the past, p roductivity assessment and performance evaluation were carried out separately due to cost constraints. Performing both simultaneously could significantly improve a project monitoring system. The appropriate use of schedule compression methods to accelerate the work at hand will reduce...

Full description

Saved in:
Bibliographic Details
Main Authors: Mansur, Shaiful Amri, Mohamed, Miswan @ Abd. Hakim
Format: Article
Language:English
Published: Faculty of Civil Engineering, Universiti Teknologi Malaysia 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/8151/1/8151.pdf
http://eprints.utm.my/id/eprint/8151/
http://web.utm.my/ipasa/images/stories/MJCE/2006/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English