Critical success factors of contractors performance appraisal system in Malaysian construction industry

Performance appraisal system is applied in many organisationsto appraise performance of employee. In construction industry, performance appraisal system is applied to appraise contractor’s performance with the works done and basically, their performance is appraised based on quality, time and cost p...

Full description

Saved in:
Bibliographic Details
Main Authors: Ismail, Syuhaida, Saleh, Abd. Latif, Mohd. Arof, Khairul Zahreen
Format: Conference or Workshop Item
Published: 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/82465/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.82465
record_format eprints
spelling my.utm.824652019-10-10T04:09:06Z http://eprints.utm.my/id/eprint/82465/ Critical success factors of contractors performance appraisal system in Malaysian construction industry Ismail, Syuhaida Saleh, Abd. Latif Mohd. Arof, Khairul Zahreen T Technology (General) Performance appraisal system is applied in many organisationsto appraise performance of employee. In construction industry, performance appraisal system is applied to appraise contractor’s performance with the works done and basically, their performance is appraised based on quality, time and cost performance. In Malaysian construction industry, Construction Industry Development Board (CIDB) has established Contractor’s Capability and Capacity (SCORE), Quality Assessment System in Construction (QLASSIC) and Safety and Health Assessment System in Construction (SHASSIC) in 2012. Unfortunately, incompliance in construction projectsstill presents. This paper is therefore undertaken with the aim to propose critical success factors(CSFs) towards the efficiency of these performance appraisal systems via literature review, questionnaire survey and expert focus group. A set of questionnaires is designed, undergone the pilot study on 15 respondents for reliability purpose and eventually distributed to 157 contractors from G1 to G7 class upon the confirmation of the questionnaire reliability status. Seven main criteria are found: quality performance; time performance; cost performance; environmental performance; health and safety performance; productivity performance; and human resources performance.Although contractor’s performance appraisal system is applied in Malaysian construction industry and benefiting construction players,yet it should be improved. The efficiency of contractor’s performance appraisal will be fulfilled byconsidering these seven CSFs into the current contractor’s performance appraisal system in Malaysia. 2018 Conference or Workshop Item PeerReviewed Ismail, Syuhaida and Saleh, Abd. Latif and Mohd. Arof, Khairul Zahreen (2018) Critical success factors of contractors performance appraisal system in Malaysian construction industry. In: The 5th International Conference on Quantitative Sciences and Its Applications (ICOQSIA 2018).
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic T Technology (General)
spellingShingle T Technology (General)
Ismail, Syuhaida
Saleh, Abd. Latif
Mohd. Arof, Khairul Zahreen
Critical success factors of contractors performance appraisal system in Malaysian construction industry
description Performance appraisal system is applied in many organisationsto appraise performance of employee. In construction industry, performance appraisal system is applied to appraise contractor’s performance with the works done and basically, their performance is appraised based on quality, time and cost performance. In Malaysian construction industry, Construction Industry Development Board (CIDB) has established Contractor’s Capability and Capacity (SCORE), Quality Assessment System in Construction (QLASSIC) and Safety and Health Assessment System in Construction (SHASSIC) in 2012. Unfortunately, incompliance in construction projectsstill presents. This paper is therefore undertaken with the aim to propose critical success factors(CSFs) towards the efficiency of these performance appraisal systems via literature review, questionnaire survey and expert focus group. A set of questionnaires is designed, undergone the pilot study on 15 respondents for reliability purpose and eventually distributed to 157 contractors from G1 to G7 class upon the confirmation of the questionnaire reliability status. Seven main criteria are found: quality performance; time performance; cost performance; environmental performance; health and safety performance; productivity performance; and human resources performance.Although contractor’s performance appraisal system is applied in Malaysian construction industry and benefiting construction players,yet it should be improved. The efficiency of contractor’s performance appraisal will be fulfilled byconsidering these seven CSFs into the current contractor’s performance appraisal system in Malaysia.
format Conference or Workshop Item
author Ismail, Syuhaida
Saleh, Abd. Latif
Mohd. Arof, Khairul Zahreen
author_facet Ismail, Syuhaida
Saleh, Abd. Latif
Mohd. Arof, Khairul Zahreen
author_sort Ismail, Syuhaida
title Critical success factors of contractors performance appraisal system in Malaysian construction industry
title_short Critical success factors of contractors performance appraisal system in Malaysian construction industry
title_full Critical success factors of contractors performance appraisal system in Malaysian construction industry
title_fullStr Critical success factors of contractors performance appraisal system in Malaysian construction industry
title_full_unstemmed Critical success factors of contractors performance appraisal system in Malaysian construction industry
title_sort critical success factors of contractors performance appraisal system in malaysian construction industry
publishDate 2018
url http://eprints.utm.my/id/eprint/82465/
_version_ 1651866660708024320