A critical review of the states art schemes for under voltage load shedding
A blackout is usually the result of increasing load beyond the transmission capacity of the power system. One of the main reasons for power blackouts is voltage collapse. To avoid this problem, the proper corrective measures called load shedding is required. In critical and extreme emergencies, unde...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
John Wiley and Sons Ltd
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/89283/1/RajaMasoodLarik2019_ACriticalReviewoftheStateofartSchemes.pdf http://eprints.utm.my/id/eprint/89283/ http://dx.doi.org/10.1002/2050-7038.2828 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |