Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company

Purpose: Completion of abandoned public facility projects is one of the major concerns of governments struggling with budget issues. Various research studies have shown that this can only be solved with the help of the private sector. Therefore, this study aims to investigate the capacity of the pri...

Full description

Saved in:
Bibliographic Details
Main Authors: Sarvari, Hadi, Cristofaro, Matteo, Chan, Daniel W. M., Md. Noor, Norhazilan, Amini, Mohammadreza
Format: Article
Published: Emerald Group Holdings Ltd. 2020
Subjects:
Online Access:http://eprints.utm.my/id/eprint/90804/
http://dx.doi.org/10.1108/JFM-07-2020-0046
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.90804
record_format eprints
spelling my.utm.908042021-05-31T13:29:44Z http://eprints.utm.my/id/eprint/90804/ Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company Sarvari, Hadi Cristofaro, Matteo Chan, Daniel W. M. Md. Noor, Norhazilan Amini, Mohammadreza TA Engineering (General). Civil engineering (General) Purpose: Completion of abandoned public facility projects is one of the major concerns of governments struggling with budget issues. Various research studies have shown that this can only be solved with the help of the private sector. Therefore, this study aims to investigate the capacity of the private sector to complete abandoned public facility projects through the study of the Water and Wastewater Company in Iran. Design/methodology/approach: The Delphi survey questionnaires, which were distributed to and responded by a panel of experts – i.e. three groups of employers of the Iranian Water and Wastewater Company, consulting agents and private sector stakeholders engaging with Water and Wastewater Company projects – identified 50 critical factors allowing the private sector to carry out abandoned facility projects. These have been categorized into four components: financial capacities, management competency, knowledge and expertise and resources and facilities. A descriptive survey method was used to determine and prioritize these factors. Findings: The survey findings indicate that knowledge and expertise are the main important clusters of factors influencing the completion of abandoned public facility projects. The value of these results is essential in providing the sound basis for mutual trust between the private sector and the public sector for greater participation, thereby helping to complete abandoned public facility projects. Originality/value: To the best of the authors’ knowledge, this is the first study attempting to investigate the capacity of the private sector to complete abandoned public facility projects through an empirical analysis of factors influencing their completion. Emerald Group Holdings Ltd. 2020-09-28 Article PeerReviewed Sarvari, Hadi and Cristofaro, Matteo and Chan, Daniel W. M. and Md. Noor, Norhazilan and Amini, Mohammadreza (2020) Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company. Journal of Facilities Management, 18 (5). pp. 547-566. ISSN 1472-5967 http://dx.doi.org/10.1108/JFM-07-2020-0046 DOI:10.1108/JFM-07-2020-0046
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Sarvari, Hadi
Cristofaro, Matteo
Chan, Daniel W. M.
Md. Noor, Norhazilan
Amini, Mohammadreza
Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
description Purpose: Completion of abandoned public facility projects is one of the major concerns of governments struggling with budget issues. Various research studies have shown that this can only be solved with the help of the private sector. Therefore, this study aims to investigate the capacity of the private sector to complete abandoned public facility projects through the study of the Water and Wastewater Company in Iran. Design/methodology/approach: The Delphi survey questionnaires, which were distributed to and responded by a panel of experts – i.e. three groups of employers of the Iranian Water and Wastewater Company, consulting agents and private sector stakeholders engaging with Water and Wastewater Company projects – identified 50 critical factors allowing the private sector to carry out abandoned facility projects. These have been categorized into four components: financial capacities, management competency, knowledge and expertise and resources and facilities. A descriptive survey method was used to determine and prioritize these factors. Findings: The survey findings indicate that knowledge and expertise are the main important clusters of factors influencing the completion of abandoned public facility projects. The value of these results is essential in providing the sound basis for mutual trust between the private sector and the public sector for greater participation, thereby helping to complete abandoned public facility projects. Originality/value: To the best of the authors’ knowledge, this is the first study attempting to investigate the capacity of the private sector to complete abandoned public facility projects through an empirical analysis of factors influencing their completion.
format Article
author Sarvari, Hadi
Cristofaro, Matteo
Chan, Daniel W. M.
Md. Noor, Norhazilan
Amini, Mohammadreza
author_facet Sarvari, Hadi
Cristofaro, Matteo
Chan, Daniel W. M.
Md. Noor, Norhazilan
Amini, Mohammadreza
author_sort Sarvari, Hadi
title Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
title_short Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
title_full Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
title_fullStr Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
title_full_unstemmed Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
title_sort completing abandoned public facility projects by the private sector: results of a delphi survey in the iranian water and wastewater company
publisher Emerald Group Holdings Ltd.
publishDate 2020
url http://eprints.utm.my/id/eprint/90804/
http://dx.doi.org/10.1108/JFM-07-2020-0046
_version_ 1702169604059561984