Machine learning model for delay risk assessment in tall building projects

Risky projects such as tall buildings have suffered an alarming rate of increase in delays and total abandonment. Though numerous delay studies predominate, what is lacking is constructive research to develop tools and techniques to wrestle the inherent problem. Consequently, this paper presents the...

Full description

Saved in:
Bibliographic Details
Main Authors: Sanni-Anibire, M. O., Zin, R. M., Olatunji, S. O.
Format: Article
Published: Taylor and Francis Ltd. 2020
Subjects:
Online Access:http://eprints.utm.my/id/eprint/93117/
http://dx.doi.org/10.1080/15623599.2020.1768326
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.93117
record_format eprints
spelling my.utm.931172021-11-07T05:54:55Z http://eprints.utm.my/id/eprint/93117/ Machine learning model for delay risk assessment in tall building projects Sanni-Anibire, M. O. Zin, R. M. Olatunji, S. O. TA Engineering (General). Civil engineering (General) Risky projects such as tall buildings have suffered an alarming rate of increase in delays and total abandonment. Though numerous delay studies predominate, what is lacking is constructive research to develop tools and techniques to wrestle the inherent problem. Consequently, this paper presents the development of a machine learning model for delay risk assessment in tall building projects. Initially, 36 delay risk factors were identified from previous literature, and subsequently developed into surveys to determine the likelihood and consequence of the risk factors. Forty-eight useable responses obtained from subject matter experts were used to develop a dataset suitable for machine learning application. K-Nearest Neighbors (KNN), Artificial Neural Networks (ANN), Support Vector Machines (SVM) and Ensemble methods were considered. Feature subset selection revealed that the most relevant independent variables include “slowness in decision making”; “delay in sub-contractors work”; “architects’/structural engineers’ late issuance of instruction”; and “waiting for approval of shop drawings and material samples”. The final results showed that the best model for predicting the risk of delay was based on ANN with a classification accuracy of 93.75%. Ultimately, the model developed in this study could support construction professionals in project risk management of tall buildings. Taylor and Francis Ltd. 2020 Article PeerReviewed Sanni-Anibire, M. O. and Zin, R. M. and Olatunji, S. O. (2020) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management . ISSN 15623599 http://dx.doi.org/10.1080/15623599.2020.1768326 DOI: 10.1080/15623599.2020.1768326
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Sanni-Anibire, M. O.
Zin, R. M.
Olatunji, S. O.
Machine learning model for delay risk assessment in tall building projects
description Risky projects such as tall buildings have suffered an alarming rate of increase in delays and total abandonment. Though numerous delay studies predominate, what is lacking is constructive research to develop tools and techniques to wrestle the inherent problem. Consequently, this paper presents the development of a machine learning model for delay risk assessment in tall building projects. Initially, 36 delay risk factors were identified from previous literature, and subsequently developed into surveys to determine the likelihood and consequence of the risk factors. Forty-eight useable responses obtained from subject matter experts were used to develop a dataset suitable for machine learning application. K-Nearest Neighbors (KNN), Artificial Neural Networks (ANN), Support Vector Machines (SVM) and Ensemble methods were considered. Feature subset selection revealed that the most relevant independent variables include “slowness in decision making”; “delay in sub-contractors work”; “architects’/structural engineers’ late issuance of instruction”; and “waiting for approval of shop drawings and material samples”. The final results showed that the best model for predicting the risk of delay was based on ANN with a classification accuracy of 93.75%. Ultimately, the model developed in this study could support construction professionals in project risk management of tall buildings.
format Article
author Sanni-Anibire, M. O.
Zin, R. M.
Olatunji, S. O.
author_facet Sanni-Anibire, M. O.
Zin, R. M.
Olatunji, S. O.
author_sort Sanni-Anibire, M. O.
title Machine learning model for delay risk assessment in tall building projects
title_short Machine learning model for delay risk assessment in tall building projects
title_full Machine learning model for delay risk assessment in tall building projects
title_fullStr Machine learning model for delay risk assessment in tall building projects
title_full_unstemmed Machine learning model for delay risk assessment in tall building projects
title_sort machine learning model for delay risk assessment in tall building projects
publisher Taylor and Francis Ltd.
publishDate 2020
url http://eprints.utm.my/id/eprint/93117/
http://dx.doi.org/10.1080/15623599.2020.1768326
_version_ 1717093422534230016