Penyenggaraan jalan luar bandar di Daerah Petaling

Maintenance of rural roads is one of development agenda that has been given priority by the Government either at the Federal or State Government level. The financial allocation for maintenance work has been approved annually through the Annual Budget Session in order to ensure the development of rur...

Full description

Saved in:
Bibliographic Details
Main Author: Misri, Mohd. Zaime
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/96854/1/MohdZaimeMisriMFABU2019.pdf.pdf
http://eprints.utm.my/id/eprint/96854/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:142805
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.96854
record_format eprints
spelling my.utm.968542022-08-28T02:37:45Z http://eprints.utm.my/id/eprint/96854/ Penyenggaraan jalan luar bandar di Daerah Petaling Misri, Mohd. Zaime TE Highway engineering. Roads and pavements Maintenance of rural roads is one of development agenda that has been given priority by the Government either at the Federal or State Government level. The financial allocation for maintenance work has been approved annually through the Annual Budget Session in order to ensure the development of rural infrastructure, especially the development of road network can be implemented properly and perfectly. However, the financial allocation is channelled to several implementing agencies who have certain methods and specifications in implementing the rural road maintenance work which will also create conflicts and problems. This situation has also resulted in the maintenance of the rural roads cannot be implemented smoothly and thus imperfectly rural roads connections. Finally, people and communities in the rural areas are not able to carry out well their daily activities and the benefits of the rural road network are not reachable. This study outlines two (2) objectives namely identifying problems in the maintenance of rural roads and studying the factors on the problems in the implementation of rural road maintenance projects. The methodology of the study was a qualitative method through a structured interview approach to respondents consisting of officers from Petaling District Public Works Department and Petaling District and Land Office. The analysis of the study was based on opinions and views of respondents who were interviewed so that the problem’s factors in the maintenance of rural roads could be described. Based on these factors and findings from the study, the Public Works Department is given full responsibility for maintaining the rural roads as the Public Works Department is a Government agency with qualifications in the implementation of physical projects. 2019 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/96854/1/MohdZaimeMisriMFABU2019.pdf.pdf Misri, Mohd. Zaime (2019) Penyenggaraan jalan luar bandar di Daerah Petaling. Masters thesis, Universiti Teknologi Malaysia. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:142805
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TE Highway engineering. Roads and pavements
spellingShingle TE Highway engineering. Roads and pavements
Misri, Mohd. Zaime
Penyenggaraan jalan luar bandar di Daerah Petaling
description Maintenance of rural roads is one of development agenda that has been given priority by the Government either at the Federal or State Government level. The financial allocation for maintenance work has been approved annually through the Annual Budget Session in order to ensure the development of rural infrastructure, especially the development of road network can be implemented properly and perfectly. However, the financial allocation is channelled to several implementing agencies who have certain methods and specifications in implementing the rural road maintenance work which will also create conflicts and problems. This situation has also resulted in the maintenance of the rural roads cannot be implemented smoothly and thus imperfectly rural roads connections. Finally, people and communities in the rural areas are not able to carry out well their daily activities and the benefits of the rural road network are not reachable. This study outlines two (2) objectives namely identifying problems in the maintenance of rural roads and studying the factors on the problems in the implementation of rural road maintenance projects. The methodology of the study was a qualitative method through a structured interview approach to respondents consisting of officers from Petaling District Public Works Department and Petaling District and Land Office. The analysis of the study was based on opinions and views of respondents who were interviewed so that the problem’s factors in the maintenance of rural roads could be described. Based on these factors and findings from the study, the Public Works Department is given full responsibility for maintaining the rural roads as the Public Works Department is a Government agency with qualifications in the implementation of physical projects.
format Thesis
author Misri, Mohd. Zaime
author_facet Misri, Mohd. Zaime
author_sort Misri, Mohd. Zaime
title Penyenggaraan jalan luar bandar di Daerah Petaling
title_short Penyenggaraan jalan luar bandar di Daerah Petaling
title_full Penyenggaraan jalan luar bandar di Daerah Petaling
title_fullStr Penyenggaraan jalan luar bandar di Daerah Petaling
title_full_unstemmed Penyenggaraan jalan luar bandar di Daerah Petaling
title_sort penyenggaraan jalan luar bandar di daerah petaling
publishDate 2019
url http://eprints.utm.my/id/eprint/96854/1/MohdZaimeMisriMFABU2019.pdf.pdf
http://eprints.utm.my/id/eprint/96854/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:142805
_version_ 1743107037153198080