A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria

Sustainable or green building rating systems were developed in many countries. Green Building Index (GBI) is the rating system developed in Malaysia, which consists of six main criteria. Material and Resources (MR) assessment is one of the main criteria that require the quantification of building ma...

Full description

Saved in:
Bibliographic Details
Main Authors: Seghier, Taki Eddine, Khosakitchalert, Chavanont, Lim, Yaik-Wah
Format: Conference or Workshop Item
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/id/eprint/98455/
http://dx.doi.org/10.1007/978-981-16-6932-3_46
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.98455
record_format eprints
spelling my.utm.984552023-01-08T02:46:32Z http://eprints.utm.my/id/eprint/98455/ A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria Seghier, Taki Eddine Khosakitchalert, Chavanont Lim, Yaik-Wah TH Building construction Sustainable or green building rating systems were developed in many countries. Green Building Index (GBI) is the rating system developed in Malaysia, which consists of six main criteria. Material and Resources (MR) assessment is one of the main criteria that require the quantification of building materials to calculate the cost of materials and giving GBI points. Conventionally, the assessment process is done manually, which is a time-consuming and error-prone process. Building Information Modelling (BIM) technology gives a new possibility to extracted material quantities instantly from a model, which can support the process of MR assessment. Therefore, this research aims to develop a BIM-MR integration method that integrates the material quantities extracted from BIM with the developed templates and scripts according to the GBI to form automatic assessment results. The prototype system was developed using Autodesk Revit and Dynamo extension, and the validation is done using a case study. With this system, the MR assessment report can be done automatically, which will save time and cost to produce the assessment documents. 2022 Conference or Workshop Item PeerReviewed Seghier, Taki Eddine and Khosakitchalert, Chavanont and Lim, Yaik-Wah (2022) A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria. In: 4th International Conference on Civil Engineering and Architecture, ICCEA 2021, 10 - 12 July 2021, Virtual, Online. http://dx.doi.org/10.1007/978-981-16-6932-3_46
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TH Building construction
spellingShingle TH Building construction
Seghier, Taki Eddine
Khosakitchalert, Chavanont
Lim, Yaik-Wah
A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria
description Sustainable or green building rating systems were developed in many countries. Green Building Index (GBI) is the rating system developed in Malaysia, which consists of six main criteria. Material and Resources (MR) assessment is one of the main criteria that require the quantification of building materials to calculate the cost of materials and giving GBI points. Conventionally, the assessment process is done manually, which is a time-consuming and error-prone process. Building Information Modelling (BIM) technology gives a new possibility to extracted material quantities instantly from a model, which can support the process of MR assessment. Therefore, this research aims to develop a BIM-MR integration method that integrates the material quantities extracted from BIM with the developed templates and scripts according to the GBI to form automatic assessment results. The prototype system was developed using Autodesk Revit and Dynamo extension, and the validation is done using a case study. With this system, the MR assessment report can be done automatically, which will save time and cost to produce the assessment documents.
format Conference or Workshop Item
author Seghier, Taki Eddine
Khosakitchalert, Chavanont
Lim, Yaik-Wah
author_facet Seghier, Taki Eddine
Khosakitchalert, Chavanont
Lim, Yaik-Wah
author_sort Seghier, Taki Eddine
title A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria
title_short A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria
title_full A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria
title_fullStr A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria
title_full_unstemmed A BIM-based method to automate material and resources assessment for the Green Building Index (GBI) criteria
title_sort bim-based method to automate material and resources assessment for the green building index (gbi) criteria
publishDate 2022
url http://eprints.utm.my/id/eprint/98455/
http://dx.doi.org/10.1007/978-981-16-6932-3_46
_version_ 1754529564303818752