MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
This practical study identifies the critical specialist works at various stages of Design and Build (D&B) contracts and their influence on the successful delivery in multiple bridge projects. These specialist works become critical activities in multiple simultaneous projects environment. This m...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/1107/1/micra2009.pdf http://eprints.utp.edu.my/1107/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |