Using a developed PM in order to optimize the production productivity in a cement industry

Cement factories are highly energy and cost intensive industries. Producing the cement requires a lot of energy to transform the raw material into final product. One major area to improve the production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful li...

Full description

Saved in:
Bibliographic Details
Main Author: ASSADI, M.KH
Format: Article
Published: JASEM ISSN 1119-8362 2011
Subjects:
Online Access:http://eprints.utp.edu.my/11667/1/13Using%20a%20developed%20PM%20in%20order%20to%20optimize%20the%20productivity%20in%20a%20cement%20Industry.pdf
http://eprints.utp.edu.my/11667/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
id my.utp.eprints.11667
record_format eprints
spelling my.utp.eprints.116672015-05-19T03:39:34Z Using a developed PM in order to optimize the production productivity in a cement industry ASSADI, M.KH TJ Mechanical engineering and machinery Cement factories are highly energy and cost intensive industries. Producing the cement requires a lot of energy to transform the raw material into final product. One major area to improve the production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful life of equipment, improve system reliability, decrease cost of replacement and finally improve system energy consumption. In this paper, the theory of microeconomics firm was used to find a model of optimal production productivity in cement industry. To show the effect of preventive maintenance system in the model, energy consumption of equipment is considered as a function of failure rate of equipment and then added to the set of constraints. Using this model energy consumption is reduced up to 15% and total annual cost is reduced up to 12.7%. JASEM ISSN 1119-8362 2011-06 Article PeerReviewed application/pdf http://eprints.utp.edu.my/11667/1/13Using%20a%20developed%20PM%20in%20order%20to%20optimize%20the%20productivity%20in%20a%20cement%20Industry.pdf ASSADI, M.KH (2011) Using a developed PM in order to optimize the production productivity in a cement industry. J. Appl. Sci. Environ. Manage, 15 (2). pp. 381-389. ISSN JASEM ISSN 1119-8362 http://eprints.utp.edu.my/11667/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
ASSADI, M.KH
Using a developed PM in order to optimize the production productivity in a cement industry
description Cement factories are highly energy and cost intensive industries. Producing the cement requires a lot of energy to transform the raw material into final product. One major area to improve the production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful life of equipment, improve system reliability, decrease cost of replacement and finally improve system energy consumption. In this paper, the theory of microeconomics firm was used to find a model of optimal production productivity in cement industry. To show the effect of preventive maintenance system in the model, energy consumption of equipment is considered as a function of failure rate of equipment and then added to the set of constraints. Using this model energy consumption is reduced up to 15% and total annual cost is reduced up to 12.7%.
format Article
author ASSADI, M.KH
author_facet ASSADI, M.KH
author_sort ASSADI, M.KH
title Using a developed PM in order to optimize the production productivity in a cement industry
title_short Using a developed PM in order to optimize the production productivity in a cement industry
title_full Using a developed PM in order to optimize the production productivity in a cement industry
title_fullStr Using a developed PM in order to optimize the production productivity in a cement industry
title_full_unstemmed Using a developed PM in order to optimize the production productivity in a cement industry
title_sort using a developed pm in order to optimize the production productivity in a cement industry
publisher JASEM ISSN 1119-8362
publishDate 2011
url http://eprints.utp.edu.my/11667/1/13Using%20a%20developed%20PM%20in%20order%20to%20optimize%20the%20productivity%20in%20a%20cement%20Industry.pdf
http://eprints.utp.edu.my/11667/
_version_ 1738655973019484160