Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil

Wax deposition in production pipelines causes flow assurance issue due to reduction in flow rate. Gelling of waxy crude oil after subsequent cooling restricts the flow and causes blockage in pipelines, and thus requiring large and costly pumps to restart and regain the steady flow. Nevertheless, the...

Full description

Saved in:
Bibliographic Details
Main Authors: Sulaiman, S.A., Biga, B.K., Chala, G.T.
Format: Article
Published: Elsevier B.V. 2017
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85011271279&doi=10.1016%2fj.petrol.2017.01.046&partnerID=40&md5=b231bec1002f46c48f58d70e1c9764c0
http://eprints.utp.edu.my/19812/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
id my.utp.eprints.19812
record_format eprints
spelling my.utp.eprints.198122018-04-22T12:58:51Z Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil Sulaiman, S.A. Biga, B.K. Chala, G.T. Wax deposition in production pipelines causes flow assurance issue due to reduction in flow rate. Gelling of waxy crude oil after subsequent cooling restricts the flow and causes blockage in pipelines, and thus requiring large and costly pumps to restart and regain the steady flow. Nevertheless, the formation of intra-gel voids in the gel was recently reported to ease restart pumping. Further, it is believed that injecting non-reacting gas into the production lines prior to or during shut down could alleviate the restart flow problem and save costs. An experimental work was conducted in order to manipulate the effectiveness of such approach. A flow loop rig was used to simulate the conditions of waxy crude oil in pipelines on seabed and a gas injection system was used to inject nitrogen into the system after crude oil stopped flowing, prior to gelation process. Restart pressure was applied in two modes: instantaneous and gradual pumping. It was observed that maximum restart pressure reductions of 11.48 and 17.44 were achieved when pressure was applied instantaneously and gradually, respectively. It was found that the restart pressure decreased as the gas to oil volume ratio increased due to high slippage effect. In addition, restart pressure under gradual restart approach was observed to be higher than that for instantaneous restart approach. © 2017 Elsevier B.V. Elsevier B.V. 2017 Article PeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85011271279&doi=10.1016%2fj.petrol.2017.01.046&partnerID=40&md5=b231bec1002f46c48f58d70e1c9764c0 Sulaiman, S.A. and Biga, B.K. and Chala, G.T. (2017) Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil. Journal of Petroleum Science and Engineering, 152 . pp. 549-554. http://eprints.utp.edu.my/19812/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description Wax deposition in production pipelines causes flow assurance issue due to reduction in flow rate. Gelling of waxy crude oil after subsequent cooling restricts the flow and causes blockage in pipelines, and thus requiring large and costly pumps to restart and regain the steady flow. Nevertheless, the formation of intra-gel voids in the gel was recently reported to ease restart pumping. Further, it is believed that injecting non-reacting gas into the production lines prior to or during shut down could alleviate the restart flow problem and save costs. An experimental work was conducted in order to manipulate the effectiveness of such approach. A flow loop rig was used to simulate the conditions of waxy crude oil in pipelines on seabed and a gas injection system was used to inject nitrogen into the system after crude oil stopped flowing, prior to gelation process. Restart pressure was applied in two modes: instantaneous and gradual pumping. It was observed that maximum restart pressure reductions of 11.48 and 17.44 were achieved when pressure was applied instantaneously and gradually, respectively. It was found that the restart pressure decreased as the gas to oil volume ratio increased due to high slippage effect. In addition, restart pressure under gradual restart approach was observed to be higher than that for instantaneous restart approach. © 2017 Elsevier B.V.
format Article
author Sulaiman, S.A.
Biga, B.K.
Chala, G.T.
spellingShingle Sulaiman, S.A.
Biga, B.K.
Chala, G.T.
Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
author_facet Sulaiman, S.A.
Biga, B.K.
Chala, G.T.
author_sort Sulaiman, S.A.
title Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
title_short Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
title_full Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
title_fullStr Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
title_full_unstemmed Injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
title_sort injection of non-reacting gas into production pipelines to ease restart pumping of waxy crude oil
publisher Elsevier B.V.
publishDate 2017
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85011271279&doi=10.1016%2fj.petrol.2017.01.046&partnerID=40&md5=b231bec1002f46c48f58d70e1c9764c0
http://eprints.utp.edu.my/19812/
_version_ 1738656122845265920