The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
Single-Minute Exchange of Die (SMED) is a popular method used to optimize the die change processing time. The purpose of this study is to identify on how to reduce set-up time by using Embedded SMED in automotive stamping press line. An actual case study at an automotive company XYZ in Malaysia was...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
Institute of Physics Publishing
2019
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85061003080&doi=10.1088%2f1757-899X%2f469%2f1%2f012005&partnerID=40&md5=ba347362b706207c803ef09cd6e927c4 http://eprints.utp.edu.my/23568/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
Summary: | Single-Minute Exchange of Die (SMED) is a popular method used to optimize the die change processing time. The purpose of this study is to identify on how to reduce set-up time by using Embedded SMED in automotive stamping press line. An actual case study at an automotive company XYZ in Malaysia was conducted based on parts supply issues. The observations, assessments and standard manufacturing practices were carried out during the study. WITNESS simulation software was used to identify the critical processes and also enable the validation of actual output based on the production. The result of the particular press line (combination of 800 Tons and 500 Tons machines) which produced 6 parts in 1-shift operations with small lot size output has been identified and improved. The significant improvement based on the Embedded SMED compared to conventional SMED approach showed a decreasing change-over time from an average of 12.51 minutes to 9.41 minutes (effectively a single-digit minute) resulting in circa 62 reduction. © Published under licence by IOP Publishing Ltd. |
---|