Tender pricing of infrastructure projects: Affecting factors

Infrastructure projects are what keep the important functions of any state alive. This paper is about a study concerning the factors affecting the tender pricing for infrastructure projects. A questionnaire was designed according to the collected factors form the literature, which were classified in...

Full description

Saved in:
Bibliographic Details
Main Authors: Tayeh, B.A., Alaloul, W.S., Al-Ghazalli, N.K.
Format: Conference or Workshop Item
Published: American Society of Civil Engineers (ASCE) 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85075915284&doi=10.1061%2f9780784482650.033&partnerID=40&md5=9c7b116e72fdaf68434abd5bdc334b78
http://eprints.utp.edu.my/23602/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
id my.utp.eprints.23602
record_format eprints
spelling my.utp.eprints.236022021-08-19T08:09:47Z Tender pricing of infrastructure projects: Affecting factors Tayeh, B.A. Alaloul, W.S. Al-Ghazalli, N.K. Infrastructure projects are what keep the important functions of any state alive. This paper is about a study concerning the factors affecting the tender pricing for infrastructure projects. A questionnaire was designed according to the collected factors form the literature, which were classified into six clusters (owner, consultant, contractor, donor, market, and project). The final version of the questionnaire was distributed to the owners, constructors, and consultants after the pilot study. The analysis shows that: the highest cluster is consultant related with RII of 81.33. The second cluster is donor related cluster with RII of 79.92. On the other hand, the highest two factors from the contractor cluster are: contractor visits to the project site, and study tender documents accurately, with RII 88.33 and 86.67, respectively. It can be recommended that the contractor should be aware of the conditions of the project site, and the nature of the soil, taking into account the different nature of the land from one location to another, knowing that the rocky land requires a high cost and a longer period of time to complete the work. Also contract terms and the executive regulations should be accurately reviewed, which may bear additional costs. © 2019 American Society of Civil Engineers. American Society of Civil Engineers (ASCE) 2019 Conference or Workshop Item NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85075915284&doi=10.1061%2f9780784482650.033&partnerID=40&md5=9c7b116e72fdaf68434abd5bdc334b78 Tayeh, B.A. and Alaloul, W.S. and Al-Ghazalli, N.K. (2019) Tender pricing of infrastructure projects: Affecting factors. In: UNSPECIFIED. http://eprints.utp.edu.my/23602/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description Infrastructure projects are what keep the important functions of any state alive. This paper is about a study concerning the factors affecting the tender pricing for infrastructure projects. A questionnaire was designed according to the collected factors form the literature, which were classified into six clusters (owner, consultant, contractor, donor, market, and project). The final version of the questionnaire was distributed to the owners, constructors, and consultants after the pilot study. The analysis shows that: the highest cluster is consultant related with RII of 81.33. The second cluster is donor related cluster with RII of 79.92. On the other hand, the highest two factors from the contractor cluster are: contractor visits to the project site, and study tender documents accurately, with RII 88.33 and 86.67, respectively. It can be recommended that the contractor should be aware of the conditions of the project site, and the nature of the soil, taking into account the different nature of the land from one location to another, knowing that the rocky land requires a high cost and a longer period of time to complete the work. Also contract terms and the executive regulations should be accurately reviewed, which may bear additional costs. © 2019 American Society of Civil Engineers.
format Conference or Workshop Item
author Tayeh, B.A.
Alaloul, W.S.
Al-Ghazalli, N.K.
spellingShingle Tayeh, B.A.
Alaloul, W.S.
Al-Ghazalli, N.K.
Tender pricing of infrastructure projects: Affecting factors
author_facet Tayeh, B.A.
Alaloul, W.S.
Al-Ghazalli, N.K.
author_sort Tayeh, B.A.
title Tender pricing of infrastructure projects: Affecting factors
title_short Tender pricing of infrastructure projects: Affecting factors
title_full Tender pricing of infrastructure projects: Affecting factors
title_fullStr Tender pricing of infrastructure projects: Affecting factors
title_full_unstemmed Tender pricing of infrastructure projects: Affecting factors
title_sort tender pricing of infrastructure projects: affecting factors
publisher American Society of Civil Engineers (ASCE)
publishDate 2019
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85075915284&doi=10.1061%2f9780784482650.033&partnerID=40&md5=9c7b116e72fdaf68434abd5bdc334b78
http://eprints.utp.edu.my/23602/
_version_ 1738656495285829632