Risk assessment factors for SME software development companies in Malaysia

There are large, medium, and small enterprises which develop software projects that can be influenced by a risk. Identifying risk is first step of perfectly assessing and controlling risks in a project. In the literature, a lot of researchers identified risk factors in software projects but none of...

Full description

Saved in:
Bibliographic Details
Main Authors: Sharif, A.M., Basri, S.
Format: Conference or Workshop Item
Published: Institute of Electrical and Electronics Engineers Inc. 2014
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84938796793&doi=10.1109%2fICCOINS.2014.6868827&partnerID=40&md5=7e30d65a881c7a47fc6501dadafcc03e
http://eprints.utp.edu.my/31200/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas