Development of project cost contingency estimation model using risk analysis and fuzzy expert system

Contractors traditionally estimate cost contingency based on subjective judgment, such as 5–10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or defend. Therefore, more objective methods for estimating proj...

Full description

Saved in:
Bibliographic Details
Main Authors: Idrus, Arazi, Nuruddin, F, Rohman, M.Arif
Format: Article
Published: Elsevier 2010
Subjects:
Online Access:http://eprints.utp.edu.my/3281/1/ESWA4955.pdf
http://eprints.utp.edu.my/3281/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas