PROCUREMENT OF BEAMS IN MULTIPLE D&B BRIDGE PROJECTS
Selected infrastructure development projects are being implemented by Design and Build (D&B) procurement system in Sabah (East Malaysia) by the Public Works Department (PWD). In the first phase 45 bridge replacement projects were awarded in 5 packages. These simultaneous multiple Bridge proje...
Saved in:
Main Authors: | , , |
---|---|
Format: | Citation Index Journal |
Published: |
Faculty of Built Environment , University of Malaya
2010
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/4272/1/vol602.pdf http://eprints.utp.edu.my/4272/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.4272 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.42722017-01-19T08:24:09Z PROCUREMENT OF BEAMS IN MULTIPLE D&B BRIDGE PROJECTS C.T, Ramanathan Sambu Potty, Narayanan M. Taharin, Radzif TA Engineering (General). Civil engineering (General) Selected infrastructure development projects are being implemented by Design and Build (D&B) procurement system in Sabah (East Malaysia) by the Public Works Department (PWD). In the first phase 45 bridge replacement projects were awarded in 5 packages. These simultaneous multiple Bridge projects are for the development of the backward areas and hence their timely completion is utmost important. Procurement and production of bridge beams have been the critical element of construction in these rural areas and no researches has been reported on various aspects of procurement of the bridge beams in multiple D&B projects. The aspects of procurement researched in this work include the determination of a common beam element for the ease of procurement and the optimization of the construction methodology, the finalization and purchasing plate dimensions to suite the manufacturer’s production range, the delivery of materials, the planning and monitoring of fabrication, the preparation and assembly, and the erection and launching of beams. The beams are optimized using element optimization techniques. The most important problems in fabricating steel girders were in planning and scheduling of materials for the fabrication and the fabrication process. Findings in all the aspects of production of steel girders are highlighted through a case study of six long span bridges at various locations in Sabah. Solutions drawn from lessons learnt which minimize wastages, and aids in timely completion of beams in multiple bridge construction are discussed. Faculty of Built Environment , University of Malaya 2010-06 Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/4272/1/vol602.pdf C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2010) PROCUREMENT OF BEAMS IN MULTIPLE D&B BRIDGE PROJECTS. [Citation Index Journal] http://eprints.utp.edu.my/4272/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) C.T, Ramanathan Sambu Potty, Narayanan M. Taharin, Radzif PROCUREMENT OF BEAMS IN MULTIPLE D&B BRIDGE PROJECTS |
description |
Selected infrastructure development projects are being implemented by Design and Build (D&B)
procurement system in Sabah (East Malaysia) by the Public Works Department (PWD). In the first
phase 45 bridge replacement projects were awarded in 5 packages. These simultaneous multiple
Bridge projects are for the development of the backward areas and hence their timely completion is
utmost important. Procurement and production of bridge beams have been the critical element of
construction in these rural areas and no researches has been reported on various aspects of procurement
of the bridge beams in multiple D&B projects. The aspects of procurement researched in this work
include the determination of a common beam element for the ease of procurement and the optimization
of the construction methodology, the finalization and purchasing plate dimensions to suite the
manufacturer’s production range, the delivery of materials, the planning and monitoring of fabrication,
the preparation and assembly, and the erection and launching of beams. The beams are optimized
using element optimization techniques. The most important problems in fabricating steel girders
were in planning and scheduling of materials for the fabrication and the fabrication process. Findings
in all the aspects of production of steel girders are highlighted through a case study of six long span
bridges at various locations in Sabah. Solutions drawn from lessons learnt which minimize wastages,
and aids in timely completion of beams in multiple bridge construction are discussed. |
format |
Citation Index Journal |
author |
C.T, Ramanathan Sambu Potty, Narayanan M. Taharin, Radzif |
author_facet |
C.T, Ramanathan Sambu Potty, Narayanan M. Taharin, Radzif |
author_sort |
C.T, Ramanathan |
title |
PROCUREMENT OF BEAMS IN MULTIPLE D&B
BRIDGE PROJECTS |
title_short |
PROCUREMENT OF BEAMS IN MULTIPLE D&B
BRIDGE PROJECTS |
title_full |
PROCUREMENT OF BEAMS IN MULTIPLE D&B
BRIDGE PROJECTS |
title_fullStr |
PROCUREMENT OF BEAMS IN MULTIPLE D&B
BRIDGE PROJECTS |
title_full_unstemmed |
PROCUREMENT OF BEAMS IN MULTIPLE D&B
BRIDGE PROJECTS |
title_sort |
procurement of beams in multiple d&b
bridge projects |
publisher |
Faculty of Built Environment , University of Malaya |
publishDate |
2010 |
url |
http://eprints.utp.edu.my/4272/1/vol602.pdf http://eprints.utp.edu.my/4272/ |
_version_ |
1738655330337816576 |