Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)

A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit stud...

Full description

Saved in:
Bibliographic Details
Main Authors: Perumal, Nallagownden, A.A., Fauzi
Format: Conference or Workshop Item
Published: 2007
Subjects:
Online Access:http://eprints.utp.edu.my/512/1/paper.pdf
http://www.scopus.com/inward/record.url?eid=2-s2.0-57949098354&partnerID=40&md5=3cb2d054dc0aff2651413ca3b5efd370
http://eprints.utp.edu.my/512/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
id my.utp.eprints.512
record_format eprints
spelling my.utp.eprints.5122017-01-19T08:27:12Z Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project) Perumal, Nallagownden A.A., Fauzi TK Electrical engineering. Electronics Nuclear engineering A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit studies. Modelling here refers to the mathematical representation of various components of a power system such as generating units, transmission lines, buses, transformers, loads, machines, etc. While simulation is required to establish the actual situation on the platform and how it will run based on different scenarios. ERACS has been extensively used in this project as it helps to improve the simulation process by increasing the speed of simulation and has a powerful graphical user interface. SUMANDAK Phase 2 (SUPG-B) Platform is chosen as a case study for sample analysis. The main objective of the project is to determine the performance of an electrical power system for an offshore platform and to validate its precision, based on the system stability and equipment selection of an actual project. ©2007 IEEE. 2007 Conference or Workshop Item NonPeerReviewed application/pdf http://eprints.utp.edu.my/512/1/paper.pdf http://www.scopus.com/inward/record.url?eid=2-s2.0-57949098354&partnerID=40&md5=3cb2d054dc0aff2651413ca3b5efd370 Perumal, Nallagownden and A.A., Fauzi (2007) Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project). In: 2007 International Conference on Intelligent and Advanced Systems, ICIAS 2007, 25 November 2007 through 28 November 2007, Kuala Lumpur. http://eprints.utp.edu.my/512/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Perumal, Nallagownden
A.A., Fauzi
Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
description A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit studies. Modelling here refers to the mathematical representation of various components of a power system such as generating units, transmission lines, buses, transformers, loads, machines, etc. While simulation is required to establish the actual situation on the platform and how it will run based on different scenarios. ERACS has been extensively used in this project as it helps to improve the simulation process by increasing the speed of simulation and has a powerful graphical user interface. SUMANDAK Phase 2 (SUPG-B) Platform is chosen as a case study for sample analysis. The main objective of the project is to determine the performance of an electrical power system for an offshore platform and to validate its precision, based on the system stability and equipment selection of an actual project. ©2007 IEEE.
format Conference or Workshop Item
author Perumal, Nallagownden
A.A., Fauzi
author_facet Perumal, Nallagownden
A.A., Fauzi
author_sort Perumal, Nallagownden
title Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
title_short Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
title_full Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
title_fullStr Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
title_full_unstemmed Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
title_sort modelling & simulation of an offshore platform (sumandak phase 2 - supg-b development project)
publishDate 2007
url http://eprints.utp.edu.my/512/1/paper.pdf
http://www.scopus.com/inward/record.url?eid=2-s2.0-57949098354&partnerID=40&md5=3cb2d054dc0aff2651413ca3b5efd370
http://eprints.utp.edu.my/512/
_version_ 1738655073022509056