Construction delay in infrastructures project.
Abstract-Construction delay causes a lot of inconvenience to number of parties.There are many factors that contributed to the cause of delays comprise of the aspects of tenders, site management, financial management, materials management, planning, organization, resources and others which come from...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/5418/1/Paper_ICSBI%2710.pdf http://eprints.utp.edu.my/5418/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.5418 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.54182017-01-19T08:23:58Z Construction delay in infrastructures project. Othman, Idris Jaafar, Mastura TA Engineering (General). Civil engineering (General) Abstract-Construction delay causes a lot of inconvenience to number of parties.There are many factors that contributed to the cause of delays comprise of the aspects of tenders, site management, financial management, materials management, planning, organization, resources and others which come from external, internal and specifics. 2010-06-16 Article PeerReviewed application/pdf http://eprints.utp.edu.my/5418/1/Paper_ICSBI%2710.pdf Othman, Idris and Jaafar, Mastura (2010) Construction delay in infrastructures project. Proceeding sustainable building and infrastructures 2010. . http://eprints.utp.edu.my/5418/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Othman, Idris Jaafar, Mastura Construction delay in infrastructures project. |
description |
Abstract-Construction delay causes a lot of inconvenience to number of parties.There are many factors that contributed to the cause of delays comprise of the aspects of tenders, site management, financial management, materials management, planning, organization, resources and others which come from external, internal and specifics. |
format |
Article |
author |
Othman, Idris Jaafar, Mastura |
author_facet |
Othman, Idris Jaafar, Mastura |
author_sort |
Othman, Idris |
title |
Construction delay in infrastructures project. |
title_short |
Construction delay in infrastructures project. |
title_full |
Construction delay in infrastructures project. |
title_fullStr |
Construction delay in infrastructures project. |
title_full_unstemmed |
Construction delay in infrastructures project. |
title_sort |
construction delay in infrastructures project. |
publishDate |
2010 |
url |
http://eprints.utp.edu.my/5418/1/Paper_ICSBI%2710.pdf http://eprints.utp.edu.my/5418/ |
_version_ |
1738655403342823424 |