Construction delay in infrastructures project.

Abstract-Construction delay causes a lot of inconvenience to number of parties.There are many factors that contributed to the cause of delays comprise of the aspects of tenders, site management, financial management, materials management, planning, organization, resources and others which come from...

Full description

Saved in:
Bibliographic Details
Main Authors: Othman, Idris, Jaafar, Mastura
Format: Article
Published: 2010
Subjects:
Online Access:http://eprints.utp.edu.my/5418/1/Paper_ICSBI%2710.pdf
http://eprints.utp.edu.my/5418/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
id my.utp.eprints.5418
record_format eprints
spelling my.utp.eprints.54182017-01-19T08:23:58Z Construction delay in infrastructures project. Othman, Idris Jaafar, Mastura TA Engineering (General). Civil engineering (General) Abstract-Construction delay causes a lot of inconvenience to number of parties.There are many factors that contributed to the cause of delays comprise of the aspects of tenders, site management, financial management, materials management, planning, organization, resources and others which come from external, internal and specifics. 2010-06-16 Article PeerReviewed application/pdf http://eprints.utp.edu.my/5418/1/Paper_ICSBI%2710.pdf Othman, Idris and Jaafar, Mastura (2010) Construction delay in infrastructures project. Proceeding sustainable building and infrastructures 2010. . http://eprints.utp.edu.my/5418/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Othman, Idris
Jaafar, Mastura
Construction delay in infrastructures project.
description Abstract-Construction delay causes a lot of inconvenience to number of parties.There are many factors that contributed to the cause of delays comprise of the aspects of tenders, site management, financial management, materials management, planning, organization, resources and others which come from external, internal and specifics.
format Article
author Othman, Idris
Jaafar, Mastura
author_facet Othman, Idris
Jaafar, Mastura
author_sort Othman, Idris
title Construction delay in infrastructures project.
title_short Construction delay in infrastructures project.
title_full Construction delay in infrastructures project.
title_fullStr Construction delay in infrastructures project.
title_full_unstemmed Construction delay in infrastructures project.
title_sort construction delay in infrastructures project.
publishDate 2010
url http://eprints.utp.edu.my/5418/1/Paper_ICSBI%2710.pdf
http://eprints.utp.edu.my/5418/
_version_ 1738655403342823424