Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
This paper presents the bus operation characteristics and performance indicators as a preliminary study in promoting public transport. A case study based on the Ipoh-Lumut corridor in Perak was conducted. The current bus system has a number of problems, such as limitation of facilities, use of lo...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/5839/1/AWAM_Proc-2007%28BusOperation%29.pdf http://eprints.utp.edu.my/5839/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.5839 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.58392017-01-19T08:26:56Z Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak Suwardo, W Napiah, Madzlan Kamaruddin, Ibrahim TE Highway engineering. Roads and pavements This paper presents the bus operation characteristics and performance indicators as a preliminary study in promoting public transport. A case study based on the Ipoh-Lumut corridor in Perak was conducted. The current bus system has a number of problems, such as limitation of facilities, use of low quality buses, inconvenience of fleets, low passenger trips, long waiting time, etc. Long waiting time, typically more than 40 minutes is very common, thus making the system unattractive to passengers. The buses only represent about 2% of traffic volume. The travel by passenger car increases rapidly but the road capacity is limited, thus some alternative form of public transport must be provided. The study aims to analyze the bus operation characteristics and performance indicators of the current bus system. The results show the deficiencies of bus service make the current bus system unattractive to passengers. This works will address issues in public transport development that will enhance the efficiency of traffic, safety and environment sustainability. 2007-05-29 Conference or Workshop Item PeerReviewed application/pdf http://eprints.utp.edu.my/5839/1/AWAM_Proc-2007%28BusOperation%29.pdf Suwardo, W and Napiah, Madzlan and Kamaruddin, Ibrahim (2007) Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak. In: AWAM'07, 29-31 May 2007, Langkawi, Malaysia. http://eprints.utp.edu.my/5839/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TE Highway engineering. Roads and pavements |
spellingShingle |
TE Highway engineering. Roads and pavements Suwardo, W Napiah, Madzlan Kamaruddin, Ibrahim Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak |
description |
This paper presents the bus operation characteristics and performance indicators as a preliminary
study in promoting public transport. A case study based on the Ipoh-Lumut corridor in
Perak was conducted. The current bus system has a number of problems, such as limitation of
facilities, use of low quality buses, inconvenience of fleets, low passenger trips, long waiting
time, etc. Long waiting time, typically more than 40 minutes is very common, thus making the
system unattractive to passengers. The buses only represent about 2% of traffic volume. The
travel by passenger car increases rapidly but the road capacity is limited, thus some alternative
form of public transport must be provided. The study aims to analyze the bus operation characteristics
and performance indicators of the current bus system. The results show the deficiencies
of bus service make the current bus system unattractive to passengers. This works will address
issues in public transport development that will enhance the efficiency of traffic, safety and environment
sustainability. |
format |
Conference or Workshop Item |
author |
Suwardo, W Napiah, Madzlan Kamaruddin, Ibrahim |
author_facet |
Suwardo, W Napiah, Madzlan Kamaruddin, Ibrahim |
author_sort |
Suwardo, W |
title |
Bus Operation Characteristics and Performance Indicators as a Preliminary Study in
Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak |
title_short |
Bus Operation Characteristics and Performance Indicators as a Preliminary Study in
Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak |
title_full |
Bus Operation Characteristics and Performance Indicators as a Preliminary Study in
Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak |
title_fullStr |
Bus Operation Characteristics and Performance Indicators as a Preliminary Study in
Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak |
title_full_unstemmed |
Bus Operation Characteristics and Performance Indicators as a Preliminary Study in
Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak |
title_sort |
bus operation characteristics and performance indicators as a preliminary study in
promoting public transport: a case study based on the ipoh-lumut corridor in perak |
publishDate |
2007 |
url |
http://eprints.utp.edu.my/5839/1/AWAM_Proc-2007%28BusOperation%29.pdf http://eprints.utp.edu.my/5839/ |
_version_ |
1738655436405473280 |