Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak

This paper presents the bus operation characteristics and performance indicators as a preliminary study in promoting public transport. A case study based on the Ipoh-Lumut corridor in Perak was conducted. The current bus system has a number of problems, such as limitation of facilities, use of lo...

Full description

Saved in:
Bibliographic Details
Main Authors: Suwardo, W, Napiah, Madzlan, Kamaruddin, Ibrahim
Format: Conference or Workshop Item
Published: 2007
Subjects:
Online Access:http://eprints.utp.edu.my/5839/1/AWAM_Proc-2007%28BusOperation%29.pdf
http://eprints.utp.edu.my/5839/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
id my.utp.eprints.5839
record_format eprints
spelling my.utp.eprints.58392017-01-19T08:26:56Z Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak Suwardo, W Napiah, Madzlan Kamaruddin, Ibrahim TE Highway engineering. Roads and pavements This paper presents the bus operation characteristics and performance indicators as a preliminary study in promoting public transport. A case study based on the Ipoh-Lumut corridor in Perak was conducted. The current bus system has a number of problems, such as limitation of facilities, use of low quality buses, inconvenience of fleets, low passenger trips, long waiting time, etc. Long waiting time, typically more than 40 minutes is very common, thus making the system unattractive to passengers. The buses only represent about 2% of traffic volume. The travel by passenger car increases rapidly but the road capacity is limited, thus some alternative form of public transport must be provided. The study aims to analyze the bus operation characteristics and performance indicators of the current bus system. The results show the deficiencies of bus service make the current bus system unattractive to passengers. This works will address issues in public transport development that will enhance the efficiency of traffic, safety and environment sustainability. 2007-05-29 Conference or Workshop Item PeerReviewed application/pdf http://eprints.utp.edu.my/5839/1/AWAM_Proc-2007%28BusOperation%29.pdf Suwardo, W and Napiah, Madzlan and Kamaruddin, Ibrahim (2007) Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak. In: AWAM'07, 29-31 May 2007, Langkawi, Malaysia. http://eprints.utp.edu.my/5839/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic TE Highway engineering. Roads and pavements
spellingShingle TE Highway engineering. Roads and pavements
Suwardo, W
Napiah, Madzlan
Kamaruddin, Ibrahim
Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
description This paper presents the bus operation characteristics and performance indicators as a preliminary study in promoting public transport. A case study based on the Ipoh-Lumut corridor in Perak was conducted. The current bus system has a number of problems, such as limitation of facilities, use of low quality buses, inconvenience of fleets, low passenger trips, long waiting time, etc. Long waiting time, typically more than 40 minutes is very common, thus making the system unattractive to passengers. The buses only represent about 2% of traffic volume. The travel by passenger car increases rapidly but the road capacity is limited, thus some alternative form of public transport must be provided. The study aims to analyze the bus operation characteristics and performance indicators of the current bus system. The results show the deficiencies of bus service make the current bus system unattractive to passengers. This works will address issues in public transport development that will enhance the efficiency of traffic, safety and environment sustainability.
format Conference or Workshop Item
author Suwardo, W
Napiah, Madzlan
Kamaruddin, Ibrahim
author_facet Suwardo, W
Napiah, Madzlan
Kamaruddin, Ibrahim
author_sort Suwardo, W
title Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
title_short Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
title_full Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
title_fullStr Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
title_full_unstemmed Bus Operation Characteristics and Performance Indicators as a Preliminary Study in Promoting Public Transport: A Case Study Based on the Ipoh-Lumut Corridor in Perak
title_sort bus operation characteristics and performance indicators as a preliminary study in promoting public transport: a case study based on the ipoh-lumut corridor in perak
publishDate 2007
url http://eprints.utp.edu.my/5839/1/AWAM_Proc-2007%28BusOperation%29.pdf
http://eprints.utp.edu.my/5839/
_version_ 1738655436405473280