Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation
A reservoir operation was reviewed to optimize the total annual hydroelectric power generation. Analysis were conducted in a week period of time using daily data of reservoir level, turbine release, power generated, rainfall and evaporation. The length of data varies from 4-20 years (1991-2010). A t...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Book Section |
Published: |
IACSIT Press
2011
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/6282/1/rp008_ICEII2011-C015.pdf http://eprints.utp.edu.my/6282/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.6282 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.62822017-01-19T08:23:07Z Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation Asfaw, Tilahun Derib Hashim, Ahmad Mustafa TC Hydraulic engineering. Ocean engineering A reservoir operation was reviewed to optimize the total annual hydroelectric power generation. Analysis were conducted in a week period of time using daily data of reservoir level, turbine release, power generated, rainfall and evaporation. The length of data varies from 4-20 years (1991-2010). A trend test for historical daily power generation was performed using Nonparametric Mann-Kendall’s test to verify the improvement. The test results indicated that there is no trend in the generation of electricity. Optimal turbine release was found through genetic algorithm optimization model. The model results showed that the four-year average hydroelectric power generation capacity factor was improved from 31.48% to 33.62%, with better reservoir level and less variation in turbine release rates. IACSIT Press Xuan, Li 2011 Book Section PeerReviewed application/pdf http://eprints.utp.edu.my/6282/1/rp008_ICEII2011-C015.pdf Asfaw, Tilahun Derib and Hashim, Ahmad Mustafa (2011) Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation. In: Environment and Industrial Innovation. IACSIT Press, Singapore, pp. 28-32. ISBN 978-981-08-9079-7 http://eprints.utp.edu.my/6282/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TC Hydraulic engineering. Ocean engineering |
spellingShingle |
TC Hydraulic engineering. Ocean engineering Asfaw, Tilahun Derib Hashim, Ahmad Mustafa Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation |
description |
A reservoir operation was reviewed to optimize the total annual hydroelectric power generation. Analysis were conducted in a week period of time using daily data of reservoir level, turbine release, power generated, rainfall and evaporation. The length of data varies from 4-20 years (1991-2010). A trend test for historical daily power generation was performed using Nonparametric Mann-Kendall’s test to verify the improvement. The test results indicated that there is no trend in the generation of electricity. Optimal turbine release was found through genetic algorithm optimization model. The model results showed that the four-year average hydroelectric power generation capacity factor was improved from 31.48% to 33.62%, with better reservoir level and less variation in turbine release rates. |
author2 |
Xuan, Li |
author_facet |
Xuan, Li Asfaw, Tilahun Derib Hashim, Ahmad Mustafa |
format |
Book Section |
author |
Asfaw, Tilahun Derib Hashim, Ahmad Mustafa |
author_sort |
Asfaw, Tilahun Derib |
title |
Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation |
title_short |
Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation |
title_full |
Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation |
title_fullStr |
Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation |
title_full_unstemmed |
Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation |
title_sort |
reservoir operation analysis aimed to optimize the capacity factor of hydroelectric power generation |
publisher |
IACSIT Press |
publishDate |
2011 |
url |
http://eprints.utp.edu.my/6282/1/rp008_ICEII2011-C015.pdf http://eprints.utp.edu.my/6282/ |
_version_ |
1738655477131116544 |