Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review
The drilling process in petroleum industry is directly proportional with economics and if even a small problems encounters on any point during drilling will might results a commercial loss (i.e. economics and time factor). This study is based on the study of all those hindrances/problems often enc...
Saved in:
Main Authors: | , , |
---|---|
Format: | Citation Index Journal |
Published: |
Maxwell Scientific Organization, 2011
2011
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/6924/1/Drilling_paper_NOV_2011.pdf http://maxwellsci.com/jp/j2p.php?jid=RJASET http://eprints.utp.edu.my/6924/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.6924 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.69242017-03-20T01:59:36Z Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review Saleem Qadir Tunio, Saleem Abdul Haque Tunio, Abdul Haque Naveed Ahmed Ghirano, Naveed T Technology (General) The drilling process in petroleum industry is directly proportional with economics and if even a small problems encounters on any point during drilling will might results a commercial loss (i.e. economics and time factor). This study is based on the study of all those hindrances/problems often encounters during vertical drilling and ways to combat against those problems. Now, these days although the drilling have been an advanced practice but the problems are still of same nature like (bore-hole instability, loss-circulation, drill pipe sticking, gas cuts in a shallow formation, salt dome, kick and back flow). This study focuses above problems which are not natural but it is due to human error or may be the improper handling of the tool during the operation but these are critical with reference to the time factor and also budgeting is there. So, if these occur then the possible remedial actions in order to save the time factor as well as the economics are kept and handled accordingly. This may involve, the proper design of drilling components regarding given geophysical data of formation, proper usage of drilling fluid to avoid bit balling, formation sloughing, maintaining hydrostatic pressure and proper usage of blow out preventor to control abnormal pressures, so that a good drilling performance will be taken into account by setting up a benchmarking process that is termed to be as “a necessity for survival”. Maxwell Scientific Organization, 2011 2011-11-25 Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/6924/1/Drilling_paper_NOV_2011.pdf http://maxwellsci.com/jp/j2p.php?jid=RJASET Saleem Qadir Tunio, Saleem and Abdul Haque Tunio, Abdul Haque and Naveed Ahmed Ghirano, Naveed (2011) Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review. [Citation Index Journal] http://eprints.utp.edu.my/6924/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Saleem Qadir Tunio, Saleem Abdul Haque Tunio, Abdul Haque Naveed Ahmed Ghirano, Naveed Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review |
description |
The drilling process in petroleum industry is directly proportional with economics and if even a small
problems encounters on any point during drilling will might results a commercial loss (i.e. economics and time
factor). This study is based on the study of all those hindrances/problems often encounters during vertical
drilling and ways to combat against those problems. Now, these days although the drilling have been an
advanced practice but the problems are still of same nature like (bore-hole instability, loss-circulation, drill pipe
sticking, gas cuts in a shallow formation, salt dome, kick and back flow). This study focuses above problems
which are not natural but it is due to human error or may be the improper handling of the tool during the
operation but these are critical with reference to the time factor and also budgeting is there. So, if these occur
then the possible remedial actions in order to save the time factor as well as the economics are kept and handled
accordingly. This may involve, the proper design of drilling components regarding given geophysical data of
formation, proper usage of drilling fluid to avoid bit balling, formation sloughing, maintaining hydrostatic
pressure and proper usage of blow out preventor to control abnormal pressures, so that a good drilling
performance will be taken into account by setting up a benchmarking process that is termed to be as “a
necessity for survival”. |
format |
Citation Index Journal |
author |
Saleem Qadir Tunio, Saleem Abdul Haque Tunio, Abdul Haque Naveed Ahmed Ghirano, Naveed |
author_facet |
Saleem Qadir Tunio, Saleem Abdul Haque Tunio, Abdul Haque Naveed Ahmed Ghirano, Naveed |
author_sort |
Saleem Qadir Tunio, Saleem |
title |
Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review |
title_short |
Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review |
title_full |
Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review |
title_fullStr |
Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review |
title_full_unstemmed |
Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review |
title_sort |
is it possible to ignore problems rising during vertical drilling? a review |
publisher |
Maxwell Scientific Organization, 2011 |
publishDate |
2011 |
url |
http://eprints.utp.edu.my/6924/1/Drilling_paper_NOV_2011.pdf http://maxwellsci.com/jp/j2p.php?jid=RJASET http://eprints.utp.edu.my/6924/ |
_version_ |
1738655531507122176 |