RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM
Malaysia has approximately 200 fixed offshore structures, some of which have been in operation for over 40 years, which is well beyond its design life. In order for these ageing fixed structures to continue in service or extend its operation, their current structural integrity condition needs to be...
Saved in:
Main Authors: | , , |
---|---|
Format: | Citation Index Journal |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/8198/1/Risk-Based_Assessment_On_Malaysia%E2%80%99s_Offshore_Jacket_Platform._khamidi.pdf http://eprints.utp.edu.my/8198/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.8198 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.81982017-03-20T01:59:33Z RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM Narayanan,, S.P Mohammad Kabir, Mohd Akram Khamidi, M. Faris TA Engineering (General). Civil engineering (General) Malaysia has approximately 200 fixed offshore structures, some of which have been in operation for over 40 years, which is well beyond its design life. In order for these ageing fixed structures to continue in service or extend its operation, their current structural integrity condition needs to be identified, addressed, prioritized and appropriate mitigation measures should be implemented. The aim of the research was to modify the framework for Structural Integrity Management developed by AMOCO for carrying out risk based assessment of Malaysia’s fixed offshore platforms. This required acquiring actual fixed offshore structure data, which comprises of design, assessment and inspection records. Two important components of this framework were identified as 1) Base line Risk ranking of Malaysia’s offshore platforms and 2) Development of a Risk Based Underwater Inspection (RBUI) programme. The classification of the platforms showed that many of the structures have exceeded the design life of 30 years. The baseline risk evaluation of the 186 platforms showed that fifty five platforms were in “very high risk” category. A risk based underwater inspection guideline was also developed. A case study was done to illustrate how it affects the inspection planning of the offshore structures. 2012 Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/8198/1/Risk-Based_Assessment_On_Malaysia%E2%80%99s_Offshore_Jacket_Platform._khamidi.pdf Narayanan,, S.P and Mohammad Kabir, Mohd Akram and Khamidi, M. Faris (2012) RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM. [Citation Index Journal] http://eprints.utp.edu.my/8198/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Narayanan,, S.P Mohammad Kabir, Mohd Akram Khamidi, M. Faris RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM |
description |
Malaysia has approximately 200 fixed offshore structures, some of which have been in operation for over 40 years, which is well beyond its design life. In order for these ageing fixed structures to continue in service or extend its operation, their current structural integrity condition needs to be identified, addressed, prioritized and appropriate mitigation measures should be implemented. The aim of the research was to modify the framework for Structural Integrity Management developed by AMOCO for carrying out risk based assessment of Malaysia’s fixed offshore platforms. This required acquiring actual fixed offshore structure data, which comprises of design, assessment and inspection records. Two important components of this framework were identified as 1) Base line Risk ranking of Malaysia’s offshore platforms and 2) Development of a Risk Based Underwater Inspection (RBUI) programme. The classification of the platforms showed that many of the structures have exceeded the design life of 30 years. The baseline risk evaluation of the 186 platforms showed that fifty five platforms were in “very high risk” category. A risk based underwater inspection guideline was also developed. A case study was done to illustrate how it affects the inspection planning of the offshore structures. |
format |
Citation Index Journal |
author |
Narayanan,, S.P Mohammad Kabir, Mohd Akram Khamidi, M. Faris |
author_facet |
Narayanan,, S.P Mohammad Kabir, Mohd Akram Khamidi, M. Faris |
author_sort |
Narayanan,, S.P |
title |
RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM |
title_short |
RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM |
title_full |
RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM |
title_fullStr |
RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM |
title_full_unstemmed |
RISK-BASED ASSESSMENT ON MALAYSIA’S OFFSHORE JACKET PLATFORM |
title_sort |
risk-based assessment on malaysia’s offshore jacket platform |
publishDate |
2012 |
url |
http://eprints.utp.edu.my/8198/1/Risk-Based_Assessment_On_Malaysia%E2%80%99s_Offshore_Jacket_Platform._khamidi.pdf http://eprints.utp.edu.my/8198/ |
_version_ |
1738655639450681344 |