Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems
Expert Systems have been used to solve complex problems efficiently if the information available is in descriptive form rather than numbers. The study has aimed to use Fuzzy expert systems to estimate the labor production rates. Production rate values of formwork installation of beam have been me...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Citation Index Journal |
Published: |
Global Journals Inc. (USA)
2012
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/8313/1/1-Estimation-of-Production-rates-for-Formwork-1.pdf http://eprints.utp.edu.my/8313/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.8313 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.83132017-01-19T08:21:51Z Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems Idrus, Arazi Muqeem, Sana Yap , Keem Siah Khamidi, M. Faris Zakaria, Mohd Saiful TA Engineering (General). Civil engineering (General) Expert Systems have been used to solve complex problems efficiently if the information available is in descriptive form rather than numbers. The study has aimed to use Fuzzy expert systems to estimate the labor production rates. Production rate values of formwork installation of beam have been measured from the project sites and factors influencing the production rates have been recorded on scale in descriptive form. Fuzzy expert system developed in this study has been compared with the previous Fuzzy expert systems used for estimating production rates. Mean Square Error of the previous and new models has been calculated and shows that proposed model gives high linguistic and numerical accuracies. Hence, the Fuzzy expert system developed in this study can be used reliably for estimating labor productivity by the construction Industry. Global Journals Inc. (USA) 2012-01 Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/8313/1/1-Estimation-of-Production-rates-for-Formwork-1.pdf Idrus, Arazi and Muqeem, Sana and Yap , Keem Siah and Khamidi, M. Faris and Zakaria, Mohd Saiful (2012) Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems. [Citation Index Journal] http://eprints.utp.edu.my/8313/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Idrus, Arazi Muqeem, Sana Yap , Keem Siah Khamidi, M. Faris Zakaria, Mohd Saiful Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems |
description |
Expert Systems have been used to solve complex problems efficiently if the
information available is in descriptive form rather than numbers. The study has aimed to use
Fuzzy expert systems to estimate the labor production rates. Production rate values of formwork
installation of beam have been measured from the project sites and factors influencing the
production rates have been recorded on scale in descriptive form. Fuzzy expert system
developed in this study has been compared with the previous Fuzzy expert systems used for
estimating production rates. Mean Square Error of the previous and new models has been
calculated and shows that proposed model gives high linguistic and numerical accuracies.
Hence, the Fuzzy expert system developed in this study can be used reliably for estimating labor
productivity by the construction Industry. |
format |
Citation Index Journal |
author |
Idrus, Arazi Muqeem, Sana Yap , Keem Siah Khamidi, M. Faris Zakaria, Mohd Saiful |
author_facet |
Idrus, Arazi Muqeem, Sana Yap , Keem Siah Khamidi, M. Faris Zakaria, Mohd Saiful |
author_sort |
Idrus, Arazi |
title |
Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems |
title_short |
Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems |
title_full |
Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems |
title_fullStr |
Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems |
title_full_unstemmed |
Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems |
title_sort |
estimation of production rates for formwork installation using fuzzy expert systems |
publisher |
Global Journals Inc. (USA) |
publishDate |
2012 |
url |
http://eprints.utp.edu.my/8313/1/1-Estimation-of-Production-rates-for-Formwork-1.pdf http://eprints.utp.edu.my/8313/ |
_version_ |
1738655647081168896 |