Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2003
|
Subjects: | |
Online Access: | http://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf http://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf http://etd.uum.edu.my/1210/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English English |
id |
my.uum.etd.1210 |
---|---|
record_format |
eprints |
spelling |
my.uum.etd.12102013-07-24T12:10:56Z http://etd.uum.edu.my/1210/ Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes Rosshairy, Abd. Rahman HD56-57.5 Industrial Productivity Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang Gula FELDA Perlis. Since there was no previous study done, partial and multifactor productivity are used in determining a suitable index for measuring productivity level on the production end of KGFP. Multifactor productivity has been determined as a suitable measuring index for productivity level at KGFP. Shift productivity and work group are also being analyzed using three-month worth of data that begins on January 2002 and ends on March 2002. This study has shown that workers on the afternoon shift from 3.00pm to 11.OOpm have the highest productivity yield. However, the difference in productivity value between the three shifts is very small. As for shift groups, group A has shown the highest productivity level followed by group C and B respectively. Next, regression analysis is done to determine the factor that relates to the productivity. Result from this analysis has shown that raw material and salary gives a significant value towards the output. 2003-08-10 Thesis NonPeerReviewed application/pdf en http://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf application/pdf en http://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf Rosshairy, Abd. Rahman (2003) Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes. Masters thesis, Universiti Utara Malaysia. |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Electronic Theses |
url_provider |
http://etd.uum.edu.my/ |
language |
English English |
topic |
HD56-57.5 Industrial Productivity |
spellingShingle |
HD56-57.5 Industrial Productivity Rosshairy, Abd. Rahman Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes |
description |
Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the
production end of Kilang Gula FELDA Perlis. Since there was no previous study done, partial and multifactor productivity are used in determining a suitable index for
measuring productivity level on the production end of KGFP. Multifactor productivity has been determined as a suitable measuring index for productivity level at KGFP. Shift productivity and work group are also being analyzed using three-month worth of data that begins on January 2002 and ends on March 2002. This study has shown that
workers on the afternoon shift from 3.00pm to 11.OOpm have the highest productivity yield. However, the difference in productivity value between the three shifts is very small. As for shift groups, group A has shown the highest productivity level followed by group C and B respectively. Next, regression analysis is done to determine the factor
that relates to the productivity. Result from this analysis has shown that raw material and salary gives a significant value towards the output.
|
format |
Thesis |
author |
Rosshairy, Abd. Rahman |
author_facet |
Rosshairy, Abd. Rahman |
author_sort |
Rosshairy, Abd. Rahman |
title |
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes |
title_short |
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes |
title_full |
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes |
title_fullStr |
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes |
title_full_unstemmed |
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes |
title_sort |
produktiviti di bahagian pengeluaran sebuah kilang : satu kajian kes |
publishDate |
2003 |
url |
http://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf http://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf http://etd.uum.edu.my/1210/ |
_version_ |
1644276384443400192 |