Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP

This study describes the seven components of the inherent risks that exist along the Palm Oil Plant (KMKS) supply chains, which are the Demand Risk (RP), Inventory Risk (RI), Supply Risk (RB), Environmental Risk (RS), Transportation Risk (RA), Delay Risk (RK) and Manpower Risk (RT), in which each ha...

Full description

Saved in:
Bibliographic Details
Main Author: Darwinah, Mohd Darwin Lim
Format: Thesis
Language:English
English
English
Published: 2016
Subjects:
Online Access:http://etd.uum.edu.my/6575/1/Depositpermission-s815105.pdf
http://etd.uum.edu.my/6575/2/s815105_01.pdf
http://etd.uum.edu.my/6575/3/s815105_02.pdf
http://etd.uum.edu.my/6575/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
English
English
id my.uum.etd.6575
record_format eprints
spelling my.uum.etd.65752017-11-27T02:04:54Z http://etd.uum.edu.my/6575/ Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP Darwinah, Mohd Darwin Lim TS155-194 Production management. Operations management HD61 Risk Management This study describes the seven components of the inherent risks that exist along the Palm Oil Plant (KMKS) supply chains, which are the Demand Risk (RP), Inventory Risk (RI), Supply Risk (RB), Environmental Risk (RS), Transportation Risk (RA), Delay Risk (RK) and Manpower Risk (RT), in which each has its own elements. 21 units of KMKS in Lahad Datu, Sabah, were selected to participate in this study. The Palm Oil Industry (IMKS) was chosen because it is the major contributor to KDNK. Most past research concerning IMKS focused on competitiveness, sustainability and obstacles in production. However, there is very little study that focused on the main risks which require more attention in the KMKS supply chain management. Face to face interviews were conducted in the early stages to get information about the risks in the supply chain of the plant. It was then followed by the distribution of questionnaires to obtain more detailed data for analysis purposes. This study applied the Saaty method called Analytical Hierarchy Process (AHP) for measuring the risk weighting components. In addition, the use of AHP was also referred to as an indicator of the level of interest risk in the KMKS supply chain. The analysis shows that KMKS should give priority to the RP component because this risk has the highest value compared to other risks. This is followed by RI, RB, RS, RT, RA and lastly RK. Overall, this study will help the plant in identifying the most important risk that needs to be addressed in advance to avoid any problems along the KMKS supply chain process. 2016 Thesis NonPeerReviewed text en http://etd.uum.edu.my/6575/1/Depositpermission-s815105.pdf text en http://etd.uum.edu.my/6575/2/s815105_01.pdf text en http://etd.uum.edu.my/6575/3/s815105_02.pdf Darwinah, Mohd Darwin Lim (2016) Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP. Masters thesis, Universiti Utara Malaysia.
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
url_provider http://etd.uum.edu.my/
language English
English
English
topic TS155-194 Production management. Operations management
HD61 Risk Management
spellingShingle TS155-194 Production management. Operations management
HD61 Risk Management
Darwinah, Mohd Darwin Lim
Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP
description This study describes the seven components of the inherent risks that exist along the Palm Oil Plant (KMKS) supply chains, which are the Demand Risk (RP), Inventory Risk (RI), Supply Risk (RB), Environmental Risk (RS), Transportation Risk (RA), Delay Risk (RK) and Manpower Risk (RT), in which each has its own elements. 21 units of KMKS in Lahad Datu, Sabah, were selected to participate in this study. The Palm Oil Industry (IMKS) was chosen because it is the major contributor to KDNK. Most past research concerning IMKS focused on competitiveness, sustainability and obstacles in production. However, there is very little study that focused on the main risks which require more attention in the KMKS supply chain management. Face to face interviews were conducted in the early stages to get information about the risks in the supply chain of the plant. It was then followed by the distribution of questionnaires to obtain more detailed data for analysis purposes. This study applied the Saaty method called Analytical Hierarchy Process (AHP) for measuring the risk weighting components. In addition, the use of AHP was also referred to as an indicator of the level of interest risk in the KMKS supply chain. The analysis shows that KMKS should give priority to the RP component because this risk has the highest value compared to other risks. This is followed by RI, RB, RS, RT, RA and lastly RK. Overall, this study will help the plant in identifying the most important risk that needs to be addressed in advance to avoid any problems along the KMKS supply chain process.
format Thesis
author Darwinah, Mohd Darwin Lim
author_facet Darwinah, Mohd Darwin Lim
author_sort Darwinah, Mohd Darwin Lim
title Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP
title_short Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP
title_full Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP
title_fullStr Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP
title_full_unstemmed Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP
title_sort keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan ahp
publishDate 2016
url http://etd.uum.edu.my/6575/1/Depositpermission-s815105.pdf
http://etd.uum.edu.my/6575/2/s815105_01.pdf
http://etd.uum.edu.my/6575/3/s815105_02.pdf
http://etd.uum.edu.my/6575/
_version_ 1644277557205401600