Client-related factors affecting delays in Malaysian school construction projects

Construction industry is an important sector which helps in developing the economic growth of Malaysia but many construction projects are prone to delay. Although many studies have been made on delay factors in generally towards Malaysian construction project, there is still lack of study about clie...

Full description

Saved in:
Bibliographic Details
Main Author: Najuwa, Mohd Nasir
Format: Thesis
Language:English
English
English
English
Published: 2018
Subjects:
Online Access:https://etd.uum.edu.my/9973/1/kebenaran%20mendeposit-tidak%20membenarkan-819124.pdf
https://etd.uum.edu.my/9973/2/s819124_01.pdf
https://etd.uum.edu.my/9973/3/s819124_02.pdf
https://etd.uum.edu.my/9973/4/s819124_references.docx
https://etd.uum.edu.my/9973/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
English
English
English
id my.uum.etd.9973
record_format eprints
spelling my.uum.etd.99732022-10-17T04:51:21Z https://etd.uum.edu.my/9973/ Client-related factors affecting delays in Malaysian school construction projects Najuwa, Mohd Nasir HD28-70 Management. Industrial Management TH Building construction Construction industry is an important sector which helps in developing the economic growth of Malaysia but many construction projects are prone to delay. Although many studies have been made on delay factors in generally towards Malaysian construction project, there is still lack of study about client related factors specifically which bring into delay of the project. The main purpose of this study is to identifying the client related factors toward delay in school construction projects located in Pulau Pinang, Kedah and Perlis. This study takes a qualitative approach to gain information from three case studies selected. Data is collected by interviewing six project participants consists of contractors and consultants with working experience ranging from 15 to 26 years. This study identified six major categories of client related factors were mismanagement at early planning, improper hiring process, poor of knowledge, delay in payment, lack of project monitoring, and lack of preparation on required document. Hence, five significant impacts were found: negative social impact towards work environment, design changes during construction phase, dispute between client, contractor and consultant, dependency of contractor towards client financial support, and poor of performance in project progress. This study has indicate seven recommendations for client which were good understanding toward cause and effect of delay, improve awareness on soft skills, adequate acknowledge and experience, good participation and commitment to team work, consider background details and experience for team selection, more spaces for designers in detailing and preparing the design and BIM (Building Information Modeling) should be introduced at early stage of institution. This study contributes a value added for future research in area of client related factors and helps to improve client capability towards project success in time completion. 2018 Thesis NonPeerReviewed text en https://etd.uum.edu.my/9973/1/kebenaran%20mendeposit-tidak%20membenarkan-819124.pdf text en https://etd.uum.edu.my/9973/2/s819124_01.pdf text en https://etd.uum.edu.my/9973/3/s819124_02.pdf text en https://etd.uum.edu.my/9973/4/s819124_references.docx Najuwa, Mohd Nasir (2018) Client-related factors affecting delays in Malaysian school construction projects. Masters thesis, Universiti Utara Malaysia.
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
url_provider http://etd.uum.edu.my/
language English
English
English
English
topic HD28-70 Management. Industrial Management
TH Building construction
spellingShingle HD28-70 Management. Industrial Management
TH Building construction
Najuwa, Mohd Nasir
Client-related factors affecting delays in Malaysian school construction projects
description Construction industry is an important sector which helps in developing the economic growth of Malaysia but many construction projects are prone to delay. Although many studies have been made on delay factors in generally towards Malaysian construction project, there is still lack of study about client related factors specifically which bring into delay of the project. The main purpose of this study is to identifying the client related factors toward delay in school construction projects located in Pulau Pinang, Kedah and Perlis. This study takes a qualitative approach to gain information from three case studies selected. Data is collected by interviewing six project participants consists of contractors and consultants with working experience ranging from 15 to 26 years. This study identified six major categories of client related factors were mismanagement at early planning, improper hiring process, poor of knowledge, delay in payment, lack of project monitoring, and lack of preparation on required document. Hence, five significant impacts were found: negative social impact towards work environment, design changes during construction phase, dispute between client, contractor and consultant, dependency of contractor towards client financial support, and poor of performance in project progress. This study has indicate seven recommendations for client which were good understanding toward cause and effect of delay, improve awareness on soft skills, adequate acknowledge and experience, good participation and commitment to team work, consider background details and experience for team selection, more spaces for designers in detailing and preparing the design and BIM (Building Information Modeling) should be introduced at early stage of institution. This study contributes a value added for future research in area of client related factors and helps to improve client capability towards project success in time completion.
format Thesis
author Najuwa, Mohd Nasir
author_facet Najuwa, Mohd Nasir
author_sort Najuwa, Mohd Nasir
title Client-related factors affecting delays in Malaysian school construction projects
title_short Client-related factors affecting delays in Malaysian school construction projects
title_full Client-related factors affecting delays in Malaysian school construction projects
title_fullStr Client-related factors affecting delays in Malaysian school construction projects
title_full_unstemmed Client-related factors affecting delays in Malaysian school construction projects
title_sort client-related factors affecting delays in malaysian school construction projects
publishDate 2018
url https://etd.uum.edu.my/9973/1/kebenaran%20mendeposit-tidak%20membenarkan-819124.pdf
https://etd.uum.edu.my/9973/2/s819124_01.pdf
https://etd.uum.edu.my/9973/3/s819124_02.pdf
https://etd.uum.edu.my/9973/4/s819124_references.docx
https://etd.uum.edu.my/9973/
_version_ 1748183200142721024