Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage,...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/11747/1/Naw.pdf http://repo.uum.edu.my/11747/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.11747 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.117472014-07-23T02:36:19Z http://repo.uum.edu.my/11747/ Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects Mohd Nawi, Mohd Nasrun Baluch, Nazim Hussain Omar, Mohd Faizal TH Building construction Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and inefficiency. Team integration is perceived as paramount. Unfortunately,there are limited numbers of studies that focus on the dimension of full IBS projects.Accordingly, this paper explores and identifies the dimension of fully integrated team from the traditional approach and conducts a validation process for implementing it in Malaysian IBS projects.The research presented uses interviews case study to obtain qualitative data.It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. 2013-11-21 Conference or Workshop Item NonPeerReviewed application/pdf en http://repo.uum.edu.my/11747/1/Naw.pdf Mohd Nawi, Mohd Nasrun and Baluch, Nazim Hussain and Omar, Mohd Faizal (2013) Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects. In: 3rd International Building Control Conference (IBCC), 21st November 2013, Royal Chulan Hotel, Kuala Lumpur, Malaysia. (Unpublished) |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Mohd Nawi, Mohd Nasrun Baluch, Nazim Hussain Omar, Mohd Faizal Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects |
description |
Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of
its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and inefficiency. Team integration is perceived as paramount. Unfortunately,there are limited numbers of studies that focus on the dimension of full IBS projects.Accordingly, this paper explores
and identifies the dimension of fully integrated team from the traditional approach and conducts a validation process for implementing it in Malaysian IBS projects.The research presented uses interviews case study to obtain qualitative data.It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. |
format |
Conference or Workshop Item |
author |
Mohd Nawi, Mohd Nasrun Baluch, Nazim Hussain Omar, Mohd Faizal |
author_facet |
Mohd Nawi, Mohd Nasrun Baluch, Nazim Hussain Omar, Mohd Faizal |
author_sort |
Mohd Nawi, Mohd Nasrun |
title |
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects |
title_short |
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects |
title_full |
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects |
title_fullStr |
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects |
title_full_unstemmed |
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects |
title_sort |
dimension of fully integrated delivery team for malaysian industrialised building system (ibs) construction projects |
publishDate |
2013 |
url |
http://repo.uum.edu.my/11747/1/Naw.pdf http://repo.uum.edu.my/11747/ |
_version_ |
1644280726361735168 |