Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects

Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage,...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Baluch, Nazim Hussain, Omar, Mohd Faizal
Format: Conference or Workshop Item
Language:English
Published: 2013
Subjects:
Online Access:http://repo.uum.edu.my/11747/1/Naw.pdf
http://repo.uum.edu.my/11747/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.11747
record_format eprints
spelling my.uum.repo.117472014-07-23T02:36:19Z http://repo.uum.edu.my/11747/ Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects Mohd Nawi, Mohd Nasrun Baluch, Nazim Hussain Omar, Mohd Faizal TH Building construction Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and inefficiency. Team integration is perceived as paramount. Unfortunately,there are limited numbers of studies that focus on the dimension of full IBS projects.Accordingly, this paper explores and identifies the dimension of fully integrated team from the traditional approach and conducts a validation process for implementing it in Malaysian IBS projects.The research presented uses interviews case study to obtain qualitative data.It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. 2013-11-21 Conference or Workshop Item NonPeerReviewed application/pdf en http://repo.uum.edu.my/11747/1/Naw.pdf Mohd Nawi, Mohd Nasrun and Baluch, Nazim Hussain and Omar, Mohd Faizal (2013) Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects. In: 3rd International Building Control Conference (IBCC), 21st November 2013, Royal Chulan Hotel, Kuala Lumpur, Malaysia. (Unpublished)
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohd Nawi, Mohd Nasrun
Baluch, Nazim Hussain
Omar, Mohd Faizal
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
description Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and inefficiency. Team integration is perceived as paramount. Unfortunately,there are limited numbers of studies that focus on the dimension of full IBS projects.Accordingly, this paper explores and identifies the dimension of fully integrated team from the traditional approach and conducts a validation process for implementing it in Malaysian IBS projects.The research presented uses interviews case study to obtain qualitative data.It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects.
format Conference or Workshop Item
author Mohd Nawi, Mohd Nasrun
Baluch, Nazim Hussain
Omar, Mohd Faizal
author_facet Mohd Nawi, Mohd Nasrun
Baluch, Nazim Hussain
Omar, Mohd Faizal
author_sort Mohd Nawi, Mohd Nasrun
title Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
title_short Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
title_full Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
title_fullStr Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
title_full_unstemmed Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
title_sort dimension of fully integrated delivery team for malaysian industrialised building system (ibs) construction projects
publishDate 2013
url http://repo.uum.edu.my/11747/1/Naw.pdf
http://repo.uum.edu.my/11747/
_version_ 1644280726361735168