Planning and design of a knowledge based system for green manufacturing management
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages.The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IOP Publishing
2013
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/12618/1/1757-899X_50_1_012065.pdf http://repo.uum.edu.my/12618/ http://dx.doi.org/10.1088/1757-899X/50/1/012065 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.12618 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.126182014-11-12T01:40:22Z http://repo.uum.edu.my/12618/ Planning and design of a knowledge based system for green manufacturing management Mohd Nawawi, Mohd Kamal Nik Mohamed, Nik Mohd Zuki Aminuddin, Adam Shariff Adli QA Mathematics This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages.The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP).The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system.The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique.The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner.The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage.The System provides valuable decision making information for the planning and design a GMM in term of business organization IOP Publishing 2013 Article PeerReviewed application/pdf en cc_by http://repo.uum.edu.my/12618/1/1757-899X_50_1_012065.pdf Mohd Nawawi, Mohd Kamal and Nik Mohamed, Nik Mohd Zuki and Aminuddin, Adam Shariff Adli (2013) Planning and design of a knowledge based system for green manufacturing management. IOP Conference Series: Materials Science and Engineering, 50. pp. 1-7. ISSN 1757-8981 http://dx.doi.org/10.1088/1757-899X/50/1/012065 doi:10.1088/1757-899X/50/1/012065 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
QA Mathematics |
spellingShingle |
QA Mathematics Mohd Nawawi, Mohd Kamal Nik Mohamed, Nik Mohd Zuki Aminuddin, Adam Shariff Adli Planning and design of a knowledge based system for green manufacturing management |
description |
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages.The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP).The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system.The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique.The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner.The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage.The System provides valuable decision making information for the planning and design a GMM in term of business organization |
format |
Article |
author |
Mohd Nawawi, Mohd Kamal Nik Mohamed, Nik Mohd Zuki Aminuddin, Adam Shariff Adli |
author_facet |
Mohd Nawawi, Mohd Kamal Nik Mohamed, Nik Mohd Zuki Aminuddin, Adam Shariff Adli |
author_sort |
Mohd Nawawi, Mohd Kamal |
title |
Planning and design of a knowledge based system for green manufacturing management |
title_short |
Planning and design of a knowledge based system for green manufacturing management |
title_full |
Planning and design of a knowledge based system for green manufacturing management |
title_fullStr |
Planning and design of a knowledge based system for green manufacturing management |
title_full_unstemmed |
Planning and design of a knowledge based system for green manufacturing management |
title_sort |
planning and design of a knowledge based system for green manufacturing management |
publisher |
IOP Publishing |
publishDate |
2013 |
url |
http://repo.uum.edu.my/12618/1/1757-899X_50_1_012065.pdf http://repo.uum.edu.my/12618/ http://dx.doi.org/10.1088/1757-899X/50/1/012065 |
_version_ |
1644280958127439872 |