Optimum generation mix for Malaysia's additional capacity using evolutionary programming
Energy Commission Malaysia is targeting 4100 MW of power generation capacity via competitive bidding to replace capacity from the 1st generation Power Purchase Agreement (PPA) that will be retired from 2015 to 2017 and to cater for future demand growth. Malaysia's generation mix has been long t...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/14027/1/07062415.pdf http://repo.uum.edu.my/14027/ http://dx.doi.org/10.1109/PECON.2014.7062415 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |