Kaizen implementation in oil field project development process in PT. CPI

Drilling new wells is an important activity to arrest production decline in every oil company, no difference in PT.Cahaya Putera Indonesia (CPI). The project development process cycle time is critical to make sure the team can deliver the quantity of new wells proposals.Activities in the project de...

Full description

Saved in:
Bibliographic Details
Main Author: Adijaya, Ficky Kusuma
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15944/1/P15.pdf
http://repo.uum.edu.my/15944/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.15944
record_format eprints
spelling my.uum.repo.159442016-04-12T08:54:04Z http://repo.uum.edu.my/15944/ Kaizen implementation in oil field project development process in PT. CPI Adijaya, Ficky Kusuma HD28 Management. Industrial Management Drilling new wells is an important activity to arrest production decline in every oil company, no difference in PT.Cahaya Putera Indonesia (CPI). The project development process cycle time is critical to make sure the team can deliver the quantity of new wells proposals.Activities in the project development process need to be revisited and evaluated to deliver most value and eliminate non-adding value activities.During the value stream mapping approximately 50% of the activities are considered redundant thus is waste to the whole process.Much of the analysis can be done in a centralized manner and then used it to multiple projects instead of keep re-inventing the wheels in every project.Kaizen implementation have reduced phase 1-3 cycle time by 36%, 36% and 11 % respectively.In this research, Kaizen implementation was only to reduce cycle time for first three phases.It was not intended to improve decision quality of each project.Future analysis could add six sigma efforts to CPDEP to increase quality decision of projects. 2014-08-18 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/15944/1/P15.pdf Adijaya, Ficky Kusuma (2014) Kaizen implementation in oil field project development process in PT. CPI. In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia. http://stmlportal.net/ictom04/TOC.html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Adijaya, Ficky Kusuma
Kaizen implementation in oil field project development process in PT. CPI
description Drilling new wells is an important activity to arrest production decline in every oil company, no difference in PT.Cahaya Putera Indonesia (CPI). The project development process cycle time is critical to make sure the team can deliver the quantity of new wells proposals.Activities in the project development process need to be revisited and evaluated to deliver most value and eliminate non-adding value activities.During the value stream mapping approximately 50% of the activities are considered redundant thus is waste to the whole process.Much of the analysis can be done in a centralized manner and then used it to multiple projects instead of keep re-inventing the wheels in every project.Kaizen implementation have reduced phase 1-3 cycle time by 36%, 36% and 11 % respectively.In this research, Kaizen implementation was only to reduce cycle time for first three phases.It was not intended to improve decision quality of each project.Future analysis could add six sigma efforts to CPDEP to increase quality decision of projects.
format Conference or Workshop Item
author Adijaya, Ficky Kusuma
author_facet Adijaya, Ficky Kusuma
author_sort Adijaya, Ficky Kusuma
title Kaizen implementation in oil field project development process in PT. CPI
title_short Kaizen implementation in oil field project development process in PT. CPI
title_full Kaizen implementation in oil field project development process in PT. CPI
title_fullStr Kaizen implementation in oil field project development process in PT. CPI
title_full_unstemmed Kaizen implementation in oil field project development process in PT. CPI
title_sort kaizen implementation in oil field project development process in pt. cpi
publishDate 2014
url http://repo.uum.edu.my/15944/1/P15.pdf
http://repo.uum.edu.my/15944/
http://stmlportal.net/ictom04/TOC.html
_version_ 1644281841042063360