Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry

Industrialised Building System (IBS) has been recognized as synonymous with industrialisation of the construction industry .In Malaysia, the domination of traditional method in IBS project has gained much attention not only from researchers but also construction industry practitioners as the impleme...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Azman, Mohamed Nor Azhari, Osman, Wan Nadzri, Radzuan, Kamaruddin, Yaakob, Mazri
Format: Article
Language:English
Published: School of Social, Development and Environmental Studies, Faculty of Social Sciences and Humanities, Universiti Kebangsaan Malaysia 2016
Subjects:
Online Access:http://repo.uum.edu.my/17857/1/GEOGRAFIA%20OTM%20M%20JSS%2012%203%2088%20-%2094.pdf
http://repo.uum.edu.my/17857/
http://www.ukm.my/geografia/v2/index.php?cont=a&item=2&thn=2016&vol=12&issue=3&ver=loc
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.17857
record_format eprints
spelling my.uum.repo.178572016-04-14T04:25:28Z http://repo.uum.edu.my/17857/ Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry Mohd Nawi, Mohd Nasrun Azman, Mohamed Nor Azhari Osman, Wan Nadzri Radzuan, Kamaruddin Yaakob, Mazri TH Building construction Industrialised Building System (IBS) has been recognized as synonymous with industrialisation of the construction industry .In Malaysia, the domination of traditional method in IBS project has gained much attention not only from researchers but also construction industry practitioners as the implementation of IBS through traditional approach almoat always led to the rise of construction problems such as increasing project time and cost, redesigning, ineffective supply chain, and others.Fragmentation process in traditional method is not a line with the concept of IBS which is required a high communication and collaboration among the project stakeholders. This study took closer look at current practice of IBS projects in Malaysia, at the need for an integration approach, and at the availability of integrated approaches in IBS projects with the objective of identifying critical success factors for integrated teams in IBS construction projects. The findings from the Focus Group Discussion (FGD) among construction industry stakeholders revealed the main barriers to the IBS adoption in Malaysia’s construction industry to be poor integration among project stakeholders during the planning and design phase.This was due to the domination of the fragmentation concept of the traditional method. School of Social, Development and Environmental Studies, Faculty of Social Sciences and Humanities, Universiti Kebangsaan Malaysia 2016 Article PeerReviewed application/pdf en http://repo.uum.edu.my/17857/1/GEOGRAFIA%20OTM%20M%20JSS%2012%203%2088%20-%2094.pdf Mohd Nawi, Mohd Nasrun and Azman, Mohamed Nor Azhari and Osman, Wan Nadzri and Radzuan, Kamaruddin and Yaakob, Mazri (2016) Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry. Geografia - Malaysian Journal of Society and Space, 12 (3). pp. 88-94. ISSN 2180-2491 http://www.ukm.my/geografia/v2/index.php?cont=a&item=2&thn=2016&vol=12&issue=3&ver=loc
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohd Nawi, Mohd Nasrun
Azman, Mohamed Nor Azhari
Osman, Wan Nadzri
Radzuan, Kamaruddin
Yaakob, Mazri
Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
description Industrialised Building System (IBS) has been recognized as synonymous with industrialisation of the construction industry .In Malaysia, the domination of traditional method in IBS project has gained much attention not only from researchers but also construction industry practitioners as the implementation of IBS through traditional approach almoat always led to the rise of construction problems such as increasing project time and cost, redesigning, ineffective supply chain, and others.Fragmentation process in traditional method is not a line with the concept of IBS which is required a high communication and collaboration among the project stakeholders. This study took closer look at current practice of IBS projects in Malaysia, at the need for an integration approach, and at the availability of integrated approaches in IBS projects with the objective of identifying critical success factors for integrated teams in IBS construction projects. The findings from the Focus Group Discussion (FGD) among construction industry stakeholders revealed the main barriers to the IBS adoption in Malaysia’s construction industry to be poor integration among project stakeholders during the planning and design phase.This was due to the domination of the fragmentation concept of the traditional method.
format Article
author Mohd Nawi, Mohd Nasrun
Azman, Mohamed Nor Azhari
Osman, Wan Nadzri
Radzuan, Kamaruddin
Yaakob, Mazri
author_facet Mohd Nawi, Mohd Nasrun
Azman, Mohamed Nor Azhari
Osman, Wan Nadzri
Radzuan, Kamaruddin
Yaakob, Mazri
author_sort Mohd Nawi, Mohd Nasrun
title Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
title_short Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
title_full Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
title_fullStr Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
title_full_unstemmed Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
title_sort key success factors for team integration practice in malaysian industrialised building system (ibs) construction industry
publisher School of Social, Development and Environmental Studies, Faculty of Social Sciences and Humanities, Universiti Kebangsaan Malaysia
publishDate 2016
url http://repo.uum.edu.my/17857/1/GEOGRAFIA%20OTM%20M%20JSS%2012%203%2088%20-%2094.pdf
http://repo.uum.edu.my/17857/
http://www.ukm.my/geografia/v2/index.php?cont=a&item=2&thn=2016&vol=12&issue=3&ver=loc
_version_ 1644282320270655488