Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review

Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute t...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad Asri, Mohammad Azwanie Naim, Mohd Nawi, Mohd Nasrun, Saad, Rohaizah, Osman, Wan Nadzri, Anuar, Herman Shah
Format: Article
Language:English
Published: American Scientific Publishers 2016
Subjects:
Online Access:http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf
http://repo.uum.edu.my/19505/
http://doi.org/10.1166/asl.2016.6696
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English