Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry

Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions.This research aims to identify the critical success factors (CSFs) of BIM implementation in Malays...

Full description

Saved in:
Bibliographic Details
Main Authors: Yaakob, Mazri, Wan Ali, Wan Nur Athirah, Radzuan, Kamaruddin
Format: Conference or Workshop Item
Language:English
Published: 2016
Subjects:
Online Access:http://repo.uum.edu.my/19507/1/AIP%20CP%201761%20%202016%201%206.pdf
http://repo.uum.edu.my/19507/
http://doi.org/10.1063/1.4960945
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.19507
record_format eprints
spelling my.uum.repo.195072016-11-15T02:38:13Z http://repo.uum.edu.my/19507/ Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry Yaakob, Mazri Wan Ali, Wan Nur Athirah Radzuan, Kamaruddin TH Building construction Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions.This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study.The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs.Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations. 2016-04-11 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/19507/1/AIP%20CP%201761%20%202016%201%206.pdf Yaakob, Mazri and Wan Ali, Wan Nur Athirah and Radzuan, Kamaruddin (2016) Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry. In: 2016 International Conference on Applied Science and Technology (ICAST 2016), 11–13 April 2016, Kedah, Malaysia. http://doi.org/10.1063/1.4960945 doi:10.1063/1.4960945
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Yaakob, Mazri
Wan Ali, Wan Nur Athirah
Radzuan, Kamaruddin
Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
description Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions.This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study.The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs.Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations.
format Conference or Workshop Item
author Yaakob, Mazri
Wan Ali, Wan Nur Athirah
Radzuan, Kamaruddin
author_facet Yaakob, Mazri
Wan Ali, Wan Nur Athirah
Radzuan, Kamaruddin
author_sort Yaakob, Mazri
title Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
title_short Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
title_full Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
title_fullStr Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
title_full_unstemmed Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
title_sort identifying critical success factors (csfs) of implementing building information modeling (bim) in malaysian construction industry
publishDate 2016
url http://repo.uum.edu.my/19507/1/AIP%20CP%201761%20%202016%201%206.pdf
http://repo.uum.edu.my/19507/
http://doi.org/10.1063/1.4960945
_version_ 1644282718577491968