Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry
Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions.This research aims to identify the critical success factors (CSFs) of BIM implementation in Malays...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/19507/1/AIP%20CP%201761%20%202016%201%206.pdf http://repo.uum.edu.my/19507/ http://doi.org/10.1063/1.4960945 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.19507 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.195072016-11-15T02:38:13Z http://repo.uum.edu.my/19507/ Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry Yaakob, Mazri Wan Ali, Wan Nur Athirah Radzuan, Kamaruddin TH Building construction Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions.This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study.The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs.Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations. 2016-04-11 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/19507/1/AIP%20CP%201761%20%202016%201%206.pdf Yaakob, Mazri and Wan Ali, Wan Nur Athirah and Radzuan, Kamaruddin (2016) Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry. In: 2016 International Conference on Applied Science and Technology (ICAST 2016), 11–13 April 2016, Kedah, Malaysia. http://doi.org/10.1063/1.4960945 doi:10.1063/1.4960945 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Yaakob, Mazri Wan Ali, Wan Nur Athirah Radzuan, Kamaruddin Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry |
description |
Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions.This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary
Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study.The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs.Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations. |
format |
Conference or Workshop Item |
author |
Yaakob, Mazri Wan Ali, Wan Nur Athirah Radzuan, Kamaruddin |
author_facet |
Yaakob, Mazri Wan Ali, Wan Nur Athirah Radzuan, Kamaruddin |
author_sort |
Yaakob, Mazri |
title |
Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry |
title_short |
Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry |
title_full |
Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry |
title_fullStr |
Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry |
title_full_unstemmed |
Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry |
title_sort |
identifying critical success factors (csfs) of implementing building information modeling (bim) in malaysian construction industry |
publishDate |
2016 |
url |
http://repo.uum.edu.my/19507/1/AIP%20CP%201761%20%202016%201%206.pdf http://repo.uum.edu.my/19507/ http://doi.org/10.1063/1.4960945 |
_version_ |
1644282718577491968 |