A review of delay factors in Malaysian Industrialized Building System (IBS) construction project

This paper contribute towards factors of delay as a whole in Malaysian construction sector by application of Industrialized Building System (IBS).Similarly to other developed countries, Malaysia getting benefits through returns from construction industry, as identified through Gross Domestic Product...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nasir, Najuwa, Mohd Nawi, Mohd Nasrun, Abdul Rahim, Mohd Kamarul Irwan, Bahaudin, Ahmad Yusni, Tapa, Afiruddin
Format: Article
Language:English
Published: Asian Research Publishing Network (ARPN) 2016
Subjects:
Online Access:http://repo.uum.edu.my/19555/1/ARPN%20jeas%202016%20%209868-9873.pdf
http://repo.uum.edu.my/19555/
http://www.arpnjournals.org/jeas/research_papers/rp_2016/jeas_0816_4852.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English