Load-bearing masonry system adoption and performance: A case study of construction company in a developing country

This study addresses the factors that influence the adoption of load-bearing masonry (LBM) system. A case study of the load-bearing masonry (LBM) system adoption is conducted through an interview to explore the situation of the technology adoption in a construction company.The finding indicates the...

Full description

Saved in:
Bibliographic Details
Main Authors: Ramli, Nor Azlinda, Abdullah, Che Sobry, Mohd Nawi, Mohd Nasrun, Bahaudin, Ahmad Yusni
Format: Conference or Workshop Item
Published: 2016
Subjects:
Online Access:http://repo.uum.edu.my/19682/
http://doi.org/10.1063/1.4960931
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Description
Summary:This study addresses the factors that influence the adoption of load-bearing masonry (LBM) system. A case study of the load-bearing masonry (LBM) system adoption is conducted through an interview to explore the situation of the technology adoption in a construction company.The finding indicates the factors influence the adoption of LBM system for the construction company are: organizational resources, usefulness, less maintenance, reduce construction time and cost.From the findings, these factors consistent with previous literature. Furthermore, the performance of the company was measured by looking into the financial and non-financial aspects.The LBM system brings good performance as it increased the profits of the company, a good quality of product and attracts more demand from customers.Thus, these factors should be considered for the other companies that are interested in implementing the LBM system in their projects.