Improving communication in managing industrialised building system (IBS) projects:Virtual environment
Traditional approaches are still dominant in virtually all construction projects in Malaysia. This was highlighted as the main barrier for further developing the Industrialized Building System (IBS) construction process. Indeed, traditional approaches implemented in IBS have been recognised by sever...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Construction Research Institute of Malaysia (CREAM)
2017
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/23131/ http://www.cream.my/main/index.php/publication/download-mcrj# |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
id |
my.uum.repo.23131 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.231312018-02-13T06:41:37Z http://repo.uum.edu.my/23131/ Improving communication in managing industrialised building system (IBS) projects:Virtual environment Ahmad Pozin, Mohd Affendi Mohd Nawi, Mohd Nasrun Azman, Mohamed Nor Azhari Lee, Angela HD28 Management. Industrial Management Traditional approaches are still dominant in virtually all construction projects in Malaysia. This was highlighted as the main barrier for further developing the Industrialized Building System (IBS) construction process. Indeed, traditional approaches implemented in IBS have been recognised by several studies as failing to support effective work teams when team processes are disconnected from each other (fragmented), thus failing to produce an effective communication process.Additionally, IBS construction involves large numbers of teams with different expertise and from different organisations, all of which are handled by different numbers of management processes, for instance in planning, manufacturing, transportation, positioning and assembling the structures that involve minimal additional site work.With the increasing demand in building bigger and better buildings and structures, construction projects are becoming more complex to manage by project managers, as they have to manage every single phase by coordinating and monitoring the entire project while at the same time, consider different values and interests from every project team members. Hence, high intensity levels of communication processes involving project team members are importance in order to produce high quality information in decision-making process and conveying instructions to all team members. Regarding the issues of communication practices inside construction projects, this paper explores how communication is applied by the project team management in managing different construction stages inside an IBS construction project with several of stakeholders from diverse locations, and different cultural and organisational backgrounds.Even though a few studies had highlighted communication barriers in the construction field, only a few investigated virtual team practices in the IBS construction industry, especially in Malaysian construction. In this context, preliminary interviews were conducted on several project managers with vast experience in managing IBS construction projects. The content analysis method was used as the technique to ensure the gathered data were comprehensively and accurately analysed.The results showed that most project teams communicated virtually within and among teams for the duration of the project implementation, which the phenomenon is resulting from modern organisational form. There are five categories associated with virtual team work environment, namely distributed area, open discussion, team attitude, communication technology, and reliability of task, all of which are exceptionally pertinent in virtual team, compared to traditional team, work interaction practices. Construction Research Institute of Malaysia (CREAM) 2017 Article PeerReviewed Ahmad Pozin, Mohd Affendi and Mohd Nawi, Mohd Nasrun and Azman, Mohamed Nor Azhari and Lee, Angela (2017) Improving communication in managing industrialised building system (IBS) projects:Virtual environment. Malaysian Construction Research Journal, 2 (2). pp. 1-13. ISSN 1985 - 3807 http://www.cream.my/main/index.php/publication/download-mcrj# |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Ahmad Pozin, Mohd Affendi Mohd Nawi, Mohd Nasrun Azman, Mohamed Nor Azhari Lee, Angela Improving communication in managing industrialised building system (IBS) projects:Virtual environment |
description |
Traditional approaches are still dominant in virtually all construction projects in Malaysia. This was highlighted as the main barrier for further developing the Industrialized Building System (IBS) construction process. Indeed, traditional approaches implemented in IBS have been recognised by several studies as failing to support effective work teams when team processes
are disconnected from each other (fragmented), thus failing to produce an effective communication process.Additionally, IBS construction involves large numbers of teams with different expertise and from different organisations, all of which are handled by different numbers of management processes, for instance in planning, manufacturing, transportation, positioning and assembling the structures that involve minimal additional site work.With the increasing demand in building bigger and better buildings and structures, construction projects are becoming more complex to manage by project managers, as they have to manage every single phase by coordinating and monitoring the entire project while at the same time, consider different values and interests from every project team members. Hence, high intensity levels of communication processes involving project team members are importance in order to produce high quality information in decision-making process and conveying instructions to all team members. Regarding the issues of communication practices inside construction projects, this paper explores how communication is applied by the project team management in managing different construction stages inside an IBS construction project with several of stakeholders from diverse locations, and different cultural and organisational backgrounds.Even though a few studies had highlighted communication barriers in the construction field, only a few investigated virtual team practices in the IBS construction industry, especially in Malaysian construction. In this context, preliminary interviews were conducted on several project managers with vast experience in managing IBS construction projects. The content analysis method was used as the technique to ensure the gathered data were comprehensively and accurately analysed.The results showed that most project teams communicated virtually within and among teams for the duration of the project implementation, which the phenomenon is resulting from modern organisational form. There are five categories associated with virtual team work environment, namely distributed area, open discussion, team attitude, communication technology, and reliability of task, all of which are exceptionally pertinent in virtual team, compared to traditional team, work interaction practices. |
format |
Article |
author |
Ahmad Pozin, Mohd Affendi Mohd Nawi, Mohd Nasrun Azman, Mohamed Nor Azhari Lee, Angela |
author_facet |
Ahmad Pozin, Mohd Affendi Mohd Nawi, Mohd Nasrun Azman, Mohamed Nor Azhari Lee, Angela |
author_sort |
Ahmad Pozin, Mohd Affendi |
title |
Improving communication in managing industrialised building system (IBS) projects:Virtual environment |
title_short |
Improving communication in managing industrialised building system (IBS) projects:Virtual environment |
title_full |
Improving communication in managing industrialised building system (IBS) projects:Virtual environment |
title_fullStr |
Improving communication in managing industrialised building system (IBS) projects:Virtual environment |
title_full_unstemmed |
Improving communication in managing industrialised building system (IBS) projects:Virtual environment |
title_sort |
improving communication in managing industrialised building system (ibs) projects:virtual environment |
publisher |
Construction Research Institute of Malaysia (CREAM) |
publishDate |
2017 |
url |
http://repo.uum.edu.my/23131/ http://www.cream.my/main/index.php/publication/download-mcrj# |
_version_ |
1644283702518218752 |