Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam

Land compensation arising from relocation is a contested issue due to a lack of agreement on the levels of compensation by settlers.The effects of use values and non-use values on land compensation gap in Bakun Hydroelectric Dam in Sarawak, Malaysia are examined in this study.Multinomial Logit econ...

Full description

Saved in:
Bibliographic Details
Main Authors: Wen, Chiat Lee, Viswanathan, K. Kuperan, Ali, Jamal
Format: Article
Language:English
Published: Universiti Malaysia Sarawak 2016
Subjects:
Online Access:http://repo.uum.edu.my/24772/1/IJBS%2017%202%202016%20291%20306.pdf
http://repo.uum.edu.my/24772/
http://publisher.unimas.my/ojs/index.php/IJBS/article/view/526
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.24772
record_format eprints
spelling my.uum.repo.247722018-09-19T08:03:39Z http://repo.uum.edu.my/24772/ Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam Wen, Chiat Lee Viswanathan, K. Kuperan Ali, Jamal HD28 Management. Industrial Management Land compensation arising from relocation is a contested issue due to a lack of agreement on the levels of compensation by settlers.The effects of use values and non-use values on land compensation gap in Bakun Hydroelectric Dam in Sarawak, Malaysia are examined in this study.Multinomial Logit econometric estimators are used to examine the land compensation gap experienced by 379 settlers resettled as a result of the development project.The relationship between use values and non-use values in determining the land compensation gap is presented in the study.The gap is important in determining the satisfaction of settlers with regard to relocation.The findings can be used for better formulation of compensation policies in the case of large development projects. Universiti Malaysia Sarawak 2016 Article PeerReviewed application/pdf en http://repo.uum.edu.my/24772/1/IJBS%2017%202%202016%20291%20306.pdf Wen, Chiat Lee and Viswanathan, K. Kuperan and Ali, Jamal (2016) Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam. International Journal of Business and Society, 17 (2). pp. 291-306. ISSN 1511-6670 http://publisher.unimas.my/ojs/index.php/IJBS/article/view/526 doi:10.1504/IJMOR.2018.088575
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Wen, Chiat Lee
Viswanathan, K. Kuperan
Ali, Jamal
Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam
description Land compensation arising from relocation is a contested issue due to a lack of agreement on the levels of compensation by settlers.The effects of use values and non-use values on land compensation gap in Bakun Hydroelectric Dam in Sarawak, Malaysia are examined in this study.Multinomial Logit econometric estimators are used to examine the land compensation gap experienced by 379 settlers resettled as a result of the development project.The relationship between use values and non-use values in determining the land compensation gap is presented in the study.The gap is important in determining the satisfaction of settlers with regard to relocation.The findings can be used for better formulation of compensation policies in the case of large development projects.
format Article
author Wen, Chiat Lee
Viswanathan, K. Kuperan
Ali, Jamal
author_facet Wen, Chiat Lee
Viswanathan, K. Kuperan
Ali, Jamal
author_sort Wen, Chiat Lee
title Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam
title_short Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam
title_full Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam
title_fullStr Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam
title_full_unstemmed Land compensation gap for the resettlement of the indigenous communties in Bakun hydroelectric Dam
title_sort land compensation gap for the resettlement of the indigenous communties in bakun hydroelectric dam
publisher Universiti Malaysia Sarawak
publishDate 2016
url http://repo.uum.edu.my/24772/1/IJBS%2017%202%202016%20291%20306.pdf
http://repo.uum.edu.my/24772/
http://publisher.unimas.my/ojs/index.php/IJBS/article/view/526
_version_ 1644284137260974080