An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects

For construction stakeholders to fully embrace sustainability, its long-term benefits and associated risks need to be identified through holistic approaches. Consensus among key stakeholders is very important to the improvement of the ecological performance of industrialized building systems (IBS),...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Noordin, Alminnourliza, Tamrin, Norhidayah, Abdul Nifa, Faizatul Akmar, Chong, Khai Lin
Format: Article
Language:English
Published: Foundation for Environmental Protection and Research (FEPR) 2019
Subjects:
Online Access:http://repo.uum.edu.my/26119/1/E%2028%20107%202019%20545%20552.pdf
http://repo.uum.edu.my/26119/
http://www.ekolojidergisi.com/current-issue
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.26119
record_format eprints
spelling my.uum.repo.261192019-06-18T01:37:26Z http://repo.uum.edu.my/26119/ An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects Mohd Nawi, Mohd Nasrun Noordin, Alminnourliza Tamrin, Norhidayah Abdul Nifa, Faizatul Akmar Chong, Khai Lin HD28 Management. Industrial Management For construction stakeholders to fully embrace sustainability, its long-term benefits and associated risks need to be identified through holistic approaches. Consensus among key stakeholders is very important to the improvement of the ecological performance of industrialized building systems (IBS), a building construction method gaining momentum in Malaysia. Sustainable construction has become an increasing concern in the Malaysian construction industry nowadays. One of the approach by the Malaysian Government to enhance the ecology or sustainability is through the implementation of IBS in the construction projects. IBS has been introduced in Malaysia since year 1960s and many industries players and academics acknowledge the advantages of IBS. Nevertheless, there have several obstacles faced in order to increase the implementation of IBS and most of the obstacles are rooted from the issues of readiness. To change from conventional or traditional method to a modern method of construction or IBS is not an easy to execute. The key point of the change is a readiness and how to ready for change. Therefore, this highlights the factors which are the key readiness factors to improve sustainable construction through the implementation of IBS. This paper used qualitative approach and interview as a research technique in data collection process.Finding from data interview and literature review, there are three key factors that influence readiness in the implementation of IBS. The key factors are suitability, knowledge and ability. The output can also be used as a guideline for construction players towards the betterment of IBS implementation by introducing the factors that should be emphasized to make sure they ready to implement IBS and get advantages from it. Foundation for Environmental Protection and Research (FEPR) 2019 Article PeerReviewed application/pdf en http://repo.uum.edu.my/26119/1/E%2028%20107%202019%20545%20552.pdf Mohd Nawi, Mohd Nasrun and Noordin, Alminnourliza and Tamrin, Norhidayah and Abdul Nifa, Faizatul Akmar and Chong, Khai Lin (2019) An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects. Ekoloji, 28 (107). pp. 545-552. ISSN 1300-1361 http://www.ekolojidergisi.com/current-issue
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Mohd Nawi, Mohd Nasrun
Noordin, Alminnourliza
Tamrin, Norhidayah
Abdul Nifa, Faizatul Akmar
Chong, Khai Lin
An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects
description For construction stakeholders to fully embrace sustainability, its long-term benefits and associated risks need to be identified through holistic approaches. Consensus among key stakeholders is very important to the improvement of the ecological performance of industrialized building systems (IBS), a building construction method gaining momentum in Malaysia. Sustainable construction has become an increasing concern in the Malaysian construction industry nowadays. One of the approach by the Malaysian Government to enhance the ecology or sustainability is through the implementation of IBS in the construction projects. IBS has been introduced in Malaysia since year 1960s and many industries players and academics acknowledge the advantages of IBS. Nevertheless, there have several obstacles faced in order to increase the implementation of IBS and most of the obstacles are rooted from the issues of readiness. To change from conventional or traditional method to a modern method of construction or IBS is not an easy to execute. The key point of the change is a readiness and how to ready for change. Therefore, this highlights the factors which are the key readiness factors to improve sustainable construction through the implementation of IBS. This paper used qualitative approach and interview as a research technique in data collection process.Finding from data interview and literature review, there are three key factors that influence readiness in the implementation of IBS. The key factors are suitability, knowledge and ability. The output can also be used as a guideline for construction players towards the betterment of IBS implementation by introducing the factors that should be emphasized to make sure they ready to implement IBS and get advantages from it.
format Article
author Mohd Nawi, Mohd Nasrun
Noordin, Alminnourliza
Tamrin, Norhidayah
Abdul Nifa, Faizatul Akmar
Chong, Khai Lin
author_facet Mohd Nawi, Mohd Nasrun
Noordin, Alminnourliza
Tamrin, Norhidayah
Abdul Nifa, Faizatul Akmar
Chong, Khai Lin
author_sort Mohd Nawi, Mohd Nasrun
title An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects
title_short An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects
title_full An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects
title_fullStr An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects
title_full_unstemmed An ecological study on enhancing the Malaysian construction ecosystem: readiness implementation factors in Industrialized Building System (IBS) projects
title_sort ecological study on enhancing the malaysian construction ecosystem: readiness implementation factors in industrialized building system (ibs) projects
publisher Foundation for Environmental Protection and Research (FEPR)
publishDate 2019
url http://repo.uum.edu.my/26119/1/E%2028%20107%202019%20545%20552.pdf
http://repo.uum.edu.my/26119/
http://www.ekolojidergisi.com/current-issue
_version_ 1644284512425738240