Evaluating project management criteria using fuzzy analytic hierarchy process
Project management is one of the most important issues to fulfil organizational objectives. The project management criteria are playing a vital role for completion of any project. The aim of this paper is to evaluate five main project criteria (time, cost, quality, risk, and safety) mathematically b...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
AIP Publishing LLC
2019
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/26980/1/AIP%20mohammed2019%201%207.pdf http://repo.uum.edu.my/26980/ http://doi.org/10.1063/1.5121097 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.26980 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.269802020-05-05T06:09:31Z http://repo.uum.edu.my/26980/ Evaluating project management criteria using fuzzy analytic hierarchy process Mohammed, Husam Jasim Al-Jubori, Ihsan Ali Mubarak Mat Kasim, Maznah QA76 Computer software Project management is one of the most important issues to fulfil organizational objectives. The project management criteria are playing a vital role for completion of any project. The aim of this paper is to evaluate five main project criteria (time, cost, quality, risk, and safety) mathematically by using a multi-criteria method in order to assist stakeholders or project managers in decision-making. The fuzzy Analytic Hierarchy Process (AHP) is selected with the use of triangular fuzzy numbers for pairwise comparison scales in prioritizing the criteria in managing projects. Utilizing the fuzzy AHP technique can facilitate uncertainty in doing evaluation. In this study, one expert who is a project manager with many years of experience was asked to carry out the evaluation. The results show that the expert’s main concern in managing project is time, and cost is the second important. The study demonstrates how uncertainty in making evaluation of multiple criteria can be solved by using fuzzy method such as fuzzy AHP, in contrary to the crisp or the traditional AHP which is based on specific values, the evaluator(s) are always ambiguous and vague to give exact judgment. Hence, the application of this fuzzy method can make the assessment outcomes more accurate, scientific, and objective. It is anticipated that this work may serve as a support tool for stakeholders in improving the project management quality level. AIP Publishing LLC 2019 Article PeerReviewed application/pdf en http://repo.uum.edu.my/26980/1/AIP%20mohammed2019%201%207.pdf Mohammed, Husam Jasim and Al-Jubori, Ihsan Ali Mubarak and Mat Kasim, Maznah (2019) Evaluating project management criteria using fuzzy analytic hierarchy process. The 4th Evaluation and Analytic Conference & Exhibition (IACE 2019), 2138. pp. 1-7. ISSN 0094-243X http://doi.org/10.1063/1.5121097 doi:10.1063/1.5121097 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutional Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
QA76 Computer software |
spellingShingle |
QA76 Computer software Mohammed, Husam Jasim Al-Jubori, Ihsan Ali Mubarak Mat Kasim, Maznah Evaluating project management criteria using fuzzy analytic hierarchy process |
description |
Project management is one of the most important issues to fulfil organizational objectives. The project management criteria are playing a vital role for completion of any project. The aim of this paper is to evaluate five main project criteria (time, cost, quality, risk, and safety) mathematically by using a multi-criteria method in order to assist stakeholders or project managers in decision-making. The fuzzy Analytic Hierarchy Process (AHP) is selected with the use of triangular fuzzy numbers for pairwise comparison scales in prioritizing the criteria in managing projects. Utilizing the fuzzy AHP technique can facilitate uncertainty in doing evaluation. In this study, one expert who is a project manager with many years of experience was asked to carry out the evaluation. The results show that the expert’s main concern in managing project is time, and cost is the second important. The study demonstrates how uncertainty in making evaluation of multiple criteria can be solved by using fuzzy method such as fuzzy AHP, in contrary to the crisp or the traditional AHP which is based on specific values, the evaluator(s) are always ambiguous and vague to give exact judgment. Hence, the application of this fuzzy method can make the assessment outcomes more accurate, scientific, and objective. It is anticipated that this work may serve as a support tool for stakeholders in improving the project management quality level. |
format |
Article |
author |
Mohammed, Husam Jasim Al-Jubori, Ihsan Ali Mubarak Mat Kasim, Maznah |
author_facet |
Mohammed, Husam Jasim Al-Jubori, Ihsan Ali Mubarak Mat Kasim, Maznah |
author_sort |
Mohammed, Husam Jasim |
title |
Evaluating project management criteria using fuzzy analytic hierarchy process |
title_short |
Evaluating project management criteria using fuzzy analytic hierarchy process |
title_full |
Evaluating project management criteria using fuzzy analytic hierarchy process |
title_fullStr |
Evaluating project management criteria using fuzzy analytic hierarchy process |
title_full_unstemmed |
Evaluating project management criteria using fuzzy analytic hierarchy process |
title_sort |
evaluating project management criteria using fuzzy analytic hierarchy process |
publisher |
AIP Publishing LLC |
publishDate |
2019 |
url |
http://repo.uum.edu.my/26980/1/AIP%20mohammed2019%201%207.pdf http://repo.uum.edu.my/26980/ http://doi.org/10.1063/1.5121097 |
_version_ |
1665896909502414848 |