An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)

Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the...

Full description

Saved in:
Bibliographic Details
Main Authors: Yaakob, Mazri, Abdul Rahim, Mohd Kamarul Irwan
Format: Monograph
Language:English
Published: UUM 2021
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/30212/1/14585.pdf
https://repo.uum.edu.my/id/eprint/30212/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.30212
record_format eprints
spelling my.uum.repo.302122023-12-27T10:42:52Z https://repo.uum.edu.my/id/eprint/30212/ An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585) Yaakob, Mazri Abdul Rahim, Mohd Kamarul Irwan QA Mathematics Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the customers’ inventory while confirming that no stock-out. The supplier indicates when each delivery time takes place, so that the customers are no longer responses to the customers' orders. Under the VMI system, the planning is proactive as it is based on the available information rather than reactive to customers' orders. Consequently, in this research, we expected that the demand at the construction sites are constant and stationary, and the construction consolidation centre (CCC) is implementing a VMI system. The concentration of this research is to minimize the transportation and inventory holding costs of the customers for a two-stage supply chain system in the construction industry. The problem is to identify what is the delivery quantities to the construction sites, what is delivery times and which routes should be used to deliver products to the customers at the construction site for the single-period deterministic inventory routing problem (SP-DIRP) in the construction sector. Furthermore, realistic side-constraints such as driving time restrictions, storage capacities constraints and constant replacement intervals are considered. Results of a simplified real-life case implementing the proposed linear mixed-integer program are shown and discussed in detail. UUM 2021 Monograph NonPeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/30212/1/14585.pdf Yaakob, Mazri and Abdul Rahim, Mohd Kamarul Irwan (2021) An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585). Technical Report. UUM. (Submitted)
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutional Repository
url_provider http://repo.uum.edu.my/
language English
topic QA Mathematics
spellingShingle QA Mathematics
Yaakob, Mazri
Abdul Rahim, Mohd Kamarul Irwan
An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
description Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the customers’ inventory while confirming that no stock-out. The supplier indicates when each delivery time takes place, so that the customers are no longer responses to the customers' orders. Under the VMI system, the planning is proactive as it is based on the available information rather than reactive to customers' orders. Consequently, in this research, we expected that the demand at the construction sites are constant and stationary, and the construction consolidation centre (CCC) is implementing a VMI system. The concentration of this research is to minimize the transportation and inventory holding costs of the customers for a two-stage supply chain system in the construction industry. The problem is to identify what is the delivery quantities to the construction sites, what is delivery times and which routes should be used to deliver products to the customers at the construction site for the single-period deterministic inventory routing problem (SP-DIRP) in the construction sector. Furthermore, realistic side-constraints such as driving time restrictions, storage capacities constraints and constant replacement intervals are considered. Results of a simplified real-life case implementing the proposed linear mixed-integer program are shown and discussed in detail.
format Monograph
author Yaakob, Mazri
Abdul Rahim, Mohd Kamarul Irwan
author_facet Yaakob, Mazri
Abdul Rahim, Mohd Kamarul Irwan
author_sort Yaakob, Mazri
title An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
title_short An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
title_full An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
title_fullStr An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
title_full_unstemmed An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
title_sort algorithm study for modeling the multi-period inventory transportation problem in construction industry (s/o 14585)
publisher UUM
publishDate 2021
url https://repo.uum.edu.my/id/eprint/30212/1/14585.pdf
https://repo.uum.edu.my/id/eprint/30212/
_version_ 1787138917557862400