Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma

Portsite plant is one of PTFI unit business that has objective to dry and load concentrate to customer ship. Business issue at Portsite plant is low productivity. Productivity is measured by number of production in one day (TPD – Ton per Day). Actual productivity is 7800 TPD lower than target that...

Full description

Saved in:
Bibliographic Details
Main Authors: Ariawan, Agus, Hasanbasri, Mursyid
Format: Conference or Workshop Item
Language:English
Published: 2010
Subjects:
Online Access:http://repo.uum.edu.my/4108/1/Agu.pdf
http://repo.uum.edu.my/4108/
http://cob.uum.edu.my/ictom
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Utara Malaysia
Language: English
id my.uum.repo.4108
record_format eprints
spelling my.uum.repo.41082016-04-24T07:27:42Z http://repo.uum.edu.my/4108/ Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma Ariawan, Agus Hasanbasri, Mursyid HD28 Management. Industrial Management Portsite plant is one of PTFI unit business that has objective to dry and load concentrate to customer ship. Business issue at Portsite plant is low productivity. Productivity is measured by number of production in one day (TPD – Ton per Day). Actual productivity is 7800 TPD lower than target that is 9840 TPD. Problem solving is done using Six Sigma with DMAIC framework. Each of root cause is analyzed by correlation analysis and process capability analysis. Analysis of variance (Anova) is used to find correlation of root cause. Process capability analysis is used to evaluate performance of each root cause. Alternative solution for each root cause is discussed by modified category importance weight that consider uncertainity of success of each criteria. Decision criteria for best solution are applicability, simplicity, performance, initial cost and on-going cost. Using Pareto Priority Index (PPI) selected business solution are create employee development plan, create computerized risk based inspection system (CRBI), implementation of occasional contract employee, implementation of vendor managed inventory (VMI), and create web based maintenance data record. Implementation of business solution will cost US$1.7M with potential saving US$82M. 2010-07 Conference or Workshop Item NonPeerReviewed application/pdf en http://repo.uum.edu.my/4108/1/Agu.pdf Ariawan, Agus and Hasanbasri, Mursyid (2010) Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma. In: 2nd International Conference on Technology and Operations Management (ICTOM), 5 - 7 July 2010 , Bayview Hotel, Langkawi. (Unpublished) http://cob.uum.edu.my/ictom
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Ariawan, Agus
Hasanbasri, Mursyid
Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
description Portsite plant is one of PTFI unit business that has objective to dry and load concentrate to customer ship. Business issue at Portsite plant is low productivity. Productivity is measured by number of production in one day (TPD – Ton per Day). Actual productivity is 7800 TPD lower than target that is 9840 TPD. Problem solving is done using Six Sigma with DMAIC framework. Each of root cause is analyzed by correlation analysis and process capability analysis. Analysis of variance (Anova) is used to find correlation of root cause. Process capability analysis is used to evaluate performance of each root cause. Alternative solution for each root cause is discussed by modified category importance weight that consider uncertainity of success of each criteria. Decision criteria for best solution are applicability, simplicity, performance, initial cost and on-going cost. Using Pareto Priority Index (PPI) selected business solution are create employee development plan, create computerized risk based inspection system (CRBI), implementation of occasional contract employee, implementation of vendor managed inventory (VMI), and create web based maintenance data record. Implementation of business solution will cost US$1.7M with potential saving US$82M.
format Conference or Workshop Item
author Ariawan, Agus
Hasanbasri, Mursyid
author_facet Ariawan, Agus
Hasanbasri, Mursyid
author_sort Ariawan, Agus
title Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
title_short Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
title_full Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
title_fullStr Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
title_full_unstemmed Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
title_sort productivity improvement at portsite plant pt. freeport indonesia using six sigma
publishDate 2010
url http://repo.uum.edu.my/4108/1/Agu.pdf
http://repo.uum.edu.my/4108/
http://cob.uum.edu.my/ictom
_version_ 1644278669947961344