Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma
Portsite plant is one of PTFI unit business that has objective to dry and load concentrate to customer ship. Business issue at Portsite plant is low productivity. Productivity is measured by number of production in one day (TPD – Ton per Day). Actual productivity is 7800 TPD lower than target that...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/4108/1/Agu.pdf http://repo.uum.edu.my/4108/ http://cob.uum.edu.my/ictom |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.4108 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.41082016-04-24T07:27:42Z http://repo.uum.edu.my/4108/ Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma Ariawan, Agus Hasanbasri, Mursyid HD28 Management. Industrial Management Portsite plant is one of PTFI unit business that has objective to dry and load concentrate to customer ship. Business issue at Portsite plant is low productivity. Productivity is measured by number of production in one day (TPD – Ton per Day). Actual productivity is 7800 TPD lower than target that is 9840 TPD. Problem solving is done using Six Sigma with DMAIC framework. Each of root cause is analyzed by correlation analysis and process capability analysis. Analysis of variance (Anova) is used to find correlation of root cause. Process capability analysis is used to evaluate performance of each root cause. Alternative solution for each root cause is discussed by modified category importance weight that consider uncertainity of success of each criteria. Decision criteria for best solution are applicability, simplicity, performance, initial cost and on-going cost. Using Pareto Priority Index (PPI) selected business solution are create employee development plan, create computerized risk based inspection system (CRBI), implementation of occasional contract employee, implementation of vendor managed inventory (VMI), and create web based maintenance data record. Implementation of business solution will cost US$1.7M with potential saving US$82M. 2010-07 Conference or Workshop Item NonPeerReviewed application/pdf en http://repo.uum.edu.my/4108/1/Agu.pdf Ariawan, Agus and Hasanbasri, Mursyid (2010) Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma. In: 2nd International Conference on Technology and Operations Management (ICTOM), 5 - 7 July 2010 , Bayview Hotel, Langkawi. (Unpublished) http://cob.uum.edu.my/ictom |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Ariawan, Agus Hasanbasri, Mursyid Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma |
description |
Portsite plant is one of PTFI unit business that has objective to dry and load concentrate to customer
ship. Business issue at Portsite plant is low productivity. Productivity is measured by number of production in one day (TPD – Ton per Day). Actual productivity is 7800 TPD lower than target that is 9840 TPD. Problem solving is done using Six Sigma with DMAIC framework. Each of root cause is
analyzed by correlation analysis and process capability analysis. Analysis of variance (Anova) is used to find correlation of root cause. Process capability analysis is used to evaluate performance of each root cause.
Alternative solution for each root cause is discussed by modified category importance weight that consider uncertainity of success of each criteria. Decision criteria for best solution are applicability, simplicity, performance, initial cost and on-going cost. Using Pareto Priority Index (PPI) selected business solution are create employee development plan, create computerized risk based inspection system (CRBI), implementation of occasional contract employee, implementation of vendor managed
inventory (VMI), and create web based maintenance data record. Implementation of business solution will cost US$1.7M with potential saving US$82M.
|
format |
Conference or Workshop Item |
author |
Ariawan, Agus Hasanbasri, Mursyid |
author_facet |
Ariawan, Agus Hasanbasri, Mursyid |
author_sort |
Ariawan, Agus |
title |
Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma |
title_short |
Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma |
title_full |
Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma |
title_fullStr |
Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma |
title_full_unstemmed |
Productivity improvement at Portsite Plant Pt. Freeport Indonesia using six sigma |
title_sort |
productivity improvement at portsite plant pt. freeport indonesia using six sigma |
publishDate |
2010 |
url |
http://repo.uum.edu.my/4108/1/Agu.pdf http://repo.uum.edu.my/4108/ http://cob.uum.edu.my/ictom |
_version_ |
1644278669947961344 |