Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study
Current efficiency models have not been used to measure the efficiency of projects conducted within an organization. This paper presents an evaluation of project efficiencies of 39 companies using data Envelopment Analysis. In-Fusion Solutions Sdn. Bhd. was chosen as the case study and data were col...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/6960/1/J2_-_JDCTA.pdf http://repo.uum.edu.my/6960/ http://dx.doi.org/10.4156/jdcta.vol6.issue9.39 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English |
id |
my.uum.repo.6960 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.69602016-04-19T01:00:21Z http://repo.uum.edu.my/6960/ Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study Abdullah, F. Ku-Mahamud, Ku Ruhana Ahmad, F. A. Ghani, N.F. M. Kasim, M. QA76 Computer software Current efficiency models have not been used to measure the efficiency of projects conducted within an organization. This paper presents an evaluation of project efficiencies of 39 companies using data Envelopment Analysis. In-Fusion Solutions Sdn. Bhd. was chosen as the case study and data were collected from primary and secondary sources.Primary data were obtained through interviews conducted with personnel from the main office and the company branch in Chennai, India. Secondary data were obtained from published and unpublished documents.Secondary data consisted of information technology completed projects which consist of three inputs and an output.These include labor cost, material cost, project duration, and project contract value.Experimental result was able to identify efficient and inefficient projects.Results obtained showed that there were three efficient projects and the remaining projects were otherwise.Peer group analysis was also conducted to compare projects that are inefficient with efficient projects which belonged to a reference set. 2012 Article PeerReviewed application/pdf en http://repo.uum.edu.my/6960/1/J2_-_JDCTA.pdf Abdullah, F. and Ku-Mahamud, Ku Ruhana and Ahmad, F. and A. Ghani, N.F. and M. Kasim, M. (2012) Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study. International Journal of Digital Content Technology and its Applications, 6 (9). pp. 310-318. ISSN 1975-9339 http://dx.doi.org/10.4156/jdcta.vol6.issue9.39 doi:10.4156/jdcta.vol6.issue9.39 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
QA76 Computer software |
spellingShingle |
QA76 Computer software Abdullah, F. Ku-Mahamud, Ku Ruhana Ahmad, F. A. Ghani, N.F. M. Kasim, M. Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study |
description |
Current efficiency models have not been used to measure the efficiency of projects conducted within an organization. This paper presents an evaluation of project efficiencies of 39 companies using data Envelopment Analysis. In-Fusion Solutions Sdn. Bhd. was chosen as the case study and data were collected from primary and secondary sources.Primary data were obtained through interviews conducted with personnel from the main office and the company branch in Chennai, India. Secondary data were obtained from published and unpublished documents.Secondary data consisted of
information technology completed projects which consist of three inputs and an output.These include labor cost, material cost, project duration, and project contract value.Experimental result was able to identify efficient and inefficient projects.Results obtained showed that there were three efficient projects and the remaining projects were otherwise.Peer group analysis was also conducted to compare projects that are inefficient with efficient projects which belonged to a reference set. |
format |
Article |
author |
Abdullah, F. Ku-Mahamud, Ku Ruhana Ahmad, F. A. Ghani, N.F. M. Kasim, M. |
author_facet |
Abdullah, F. Ku-Mahamud, Ku Ruhana Ahmad, F. A. Ghani, N.F. M. Kasim, M. |
author_sort |
Abdullah, F. |
title |
Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study |
title_short |
Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study |
title_full |
Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study |
title_fullStr |
Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study |
title_full_unstemmed |
Relative Efficiency Assessment of Projects Using Data Envelopment Analysis: A Case Study |
title_sort |
relative efficiency assessment of projects using data envelopment analysis: a case study |
publishDate |
2012 |
url |
http://repo.uum.edu.my/6960/1/J2_-_JDCTA.pdf http://repo.uum.edu.my/6960/ http://dx.doi.org/10.4156/jdcta.vol6.issue9.39 |
_version_ |
1644279409079746560 |