Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman
One of the challenges to improve the quality of construction industry is through the application of Value Management concept that should be practiced by the construction industry players.Value Management and life cycle cost concept should be practiced in procurement and making decision; not only at...
Saved in:
Main Authors: | , , |
---|---|
Format: | Monograph |
Language: | English English |
Published: |
Universiti Utara Malaysia
2007
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/7795/1/nOR.pdf http://repo.uum.edu.my/7795/3/1.Noraniza%20Yusoff.pdf http://repo.uum.edu.my/7795/ http://lintas.uum.edu.my:8080/elmu/index.jsp?module=webopac-l&action=fullDisplayRetriever.jsp&szMaterialNo=0000259297 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Utara Malaysia |
Language: | English English |
id |
my.uum.repo.7795 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.77952014-07-09T00:47:29Z http://repo.uum.edu.my/7795/ Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman Yusoff, Noraniza Talib, Azlizan Pon, Yusop HC Economic History and Conditions One of the challenges to improve the quality of construction industry is through the application of Value Management concept that should be practiced by the construction industry players.Value Management and life cycle cost concept should be practiced in procurement and making decision; not only at the inception stage but to consider the whole life cycle cost of construction project. The application of Value Management can optimize the cost for the necessary quality (Construction Industry Master Plan, 2006-2015).Nevertheless, what is the Malaysian construction industry player’s level of knowledge towards the Value Management concept in the realization of its application to improve Malaysian construction industry? Therefore, this study has been carried out to identify the consultant organizational level of knowledge towards Value Management concept in Kedah construction industry.Besides, this study try to identify the Value Management application rate by those consultant.This study also try to investigate the factors that encourage and inhibit the Value Management application in Kedah construction industry.Questionnaires have been distributed to 46 consultant organizations with 31 organizations have given their feedback. Universiti Utara Malaysia 2007 Monograph NonPeerReviewed application/pdf en http://repo.uum.edu.my/7795/1/nOR.pdf application/pdf en http://repo.uum.edu.my/7795/3/1.Noraniza%20Yusoff.pdf Yusoff, Noraniza and Talib, Azlizan and Pon, Yusop (2007) Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman. Project Report. Universiti Utara Malaysia. (Unpublished) http://lintas.uum.edu.my:8080/elmu/index.jsp?module=webopac-l&action=fullDisplayRetriever.jsp&szMaterialNo=0000259297 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English English |
topic |
HC Economic History and Conditions |
spellingShingle |
HC Economic History and Conditions Yusoff, Noraniza Talib, Azlizan Pon, Yusop Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman |
description |
One of the challenges to improve the quality of construction industry is through the application of Value Management concept that should be practiced by the construction industry players.Value Management and life cycle cost concept should be practiced in procurement and making decision; not only at the inception stage but to consider the whole life cycle cost of construction project. The application of Value Management can optimize the cost for the necessary quality (Construction Industry Master Plan, 2006-2015).Nevertheless, what is the Malaysian construction industry player’s level of knowledge towards the Value Management concept in the realization of its application to improve Malaysian construction industry? Therefore, this study has been carried out to identify the consultant organizational level of knowledge towards Value Management concept in Kedah construction industry.Besides, this study try to identify the Value Management application rate by those consultant.This study also try to investigate the factors that encourage and inhibit the Value Management application in Kedah construction industry.Questionnaires have been distributed to 46 consultant organizations with 31 organizations have given their feedback. |
format |
Monograph |
author |
Yusoff, Noraniza Talib, Azlizan Pon, Yusop |
author_facet |
Yusoff, Noraniza Talib, Azlizan Pon, Yusop |
author_sort |
Yusoff, Noraniza |
title |
Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman |
title_short |
Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman |
title_full |
Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman |
title_fullStr |
Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman |
title_full_unstemmed |
Impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah Kubang Pasu dan Pendang Kedah Darul Aman |
title_sort |
impak pembangunan infrastruktur ke atas pembangunan komuniti di daerah kubang pasu dan pendang kedah darul aman |
publisher |
Universiti Utara Malaysia |
publishDate |
2007 |
url |
http://repo.uum.edu.my/7795/1/nOR.pdf http://repo.uum.edu.my/7795/3/1.Noraniza%20Yusoff.pdf http://repo.uum.edu.my/7795/ http://lintas.uum.edu.my:8080/elmu/index.jsp?module=webopac-l&action=fullDisplayRetriever.jsp&szMaterialNo=0000259297 |
_version_ |
1644279644082405376 |