A system study on IC Chemicals, Inc.

The study focused on IC Chemicals production system of the waterproofing products. The background profile of IC Chemicals, Inc. was obtained and the present production system was documented through the use of PRIME-U partitioning method and other work measurement techniques (Atienza, 2011). Problem...

Full description

Saved in:
Bibliographic Details
Main Authors: Alegrio, Maria Isabella A., Bautista, Javier L., Resari, Suzana Chimelle V.
Format: text
Language:English
Published: Animo Repository 2016
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/10022
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-10667
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-106672021-08-25T03:29:34Z A system study on IC Chemicals, Inc. Alegrio, Maria Isabella A. Bautista, Javier L. Resari, Suzana Chimelle V. The study focused on IC Chemicals production system of the waterproofing products. The background profile of IC Chemicals, Inc. was obtained and the present production system was documented through the use of PRIME-U partitioning method and other work measurement techniques (Atienza, 2011). Problem prioritization techniques such as SWOT, successive short-listing, and WOR-SURG were used to determine the problem statement. The following problem statement was found to have the highest overall WOT-SURG rating: The daily average mixer downtime of 74 minutes exceeds the maximum mixer downtime of 58 minutes. Further analysis revealed that 84% of the problem were caused by the following: replacement of mixers, problem was misdiagnosed, waiting for technician, gears jammed, accumulation of dirt in wiring, broken transformer, loose belt, waiting for spare parts, and broken belt. The proposed system are: (1) implementing standard maintenance and repair procedure and schedule (2) Kanban inventory system and, (3) training workers for additional tasks. The quantitative cost-benefit analysis revealed a favorable net benefit. Implementation of the proposed solutions is expected to reduce the mixer downtime by 55%. Further, annual benefits of Php1.5 million was computed with a net present value of Php4.8 million in 5 years. 2016-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/10022 Bachelor's Theses English Animo Repository Waterproofing Production engineering Industrial engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Waterproofing
Production engineering
Industrial engineering
spellingShingle Waterproofing
Production engineering
Industrial engineering
Alegrio, Maria Isabella A.
Bautista, Javier L.
Resari, Suzana Chimelle V.
A system study on IC Chemicals, Inc.
description The study focused on IC Chemicals production system of the waterproofing products. The background profile of IC Chemicals, Inc. was obtained and the present production system was documented through the use of PRIME-U partitioning method and other work measurement techniques (Atienza, 2011). Problem prioritization techniques such as SWOT, successive short-listing, and WOR-SURG were used to determine the problem statement. The following problem statement was found to have the highest overall WOT-SURG rating: The daily average mixer downtime of 74 minutes exceeds the maximum mixer downtime of 58 minutes. Further analysis revealed that 84% of the problem were caused by the following: replacement of mixers, problem was misdiagnosed, waiting for technician, gears jammed, accumulation of dirt in wiring, broken transformer, loose belt, waiting for spare parts, and broken belt. The proposed system are: (1) implementing standard maintenance and repair procedure and schedule (2) Kanban inventory system and, (3) training workers for additional tasks. The quantitative cost-benefit analysis revealed a favorable net benefit. Implementation of the proposed solutions is expected to reduce the mixer downtime by 55%. Further, annual benefits of Php1.5 million was computed with a net present value of Php4.8 million in 5 years.
format text
author Alegrio, Maria Isabella A.
Bautista, Javier L.
Resari, Suzana Chimelle V.
author_facet Alegrio, Maria Isabella A.
Bautista, Javier L.
Resari, Suzana Chimelle V.
author_sort Alegrio, Maria Isabella A.
title A system study on IC Chemicals, Inc.
title_short A system study on IC Chemicals, Inc.
title_full A system study on IC Chemicals, Inc.
title_fullStr A system study on IC Chemicals, Inc.
title_full_unstemmed A system study on IC Chemicals, Inc.
title_sort system study on ic chemicals, inc.
publisher Animo Repository
publishDate 2016
url https://animorepository.dlsu.edu.ph/etd_bachelors/10022
_version_ 1772834713187123200