A systems study on Pelina Shoes Manufacturing

Pelina Shoes Manufacturing has been in the operations since 1978. Presently, it already has three customers in the Philippines namely Ferretti, Mario D Boro and Rusty Lopez. The system was conducted in Marikina City, Metro Manila. Data gathering was done on the different parts of the system namely p...

Full description

Saved in:
Bibliographic Details
Main Authors: Jimenez, Ramon Enrique Angelo D., Salvador, Nicolette Roxanne G., Sindiong, Rafael B.
Format: text
Language:English
Published: Animo Repository 2011
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/11247
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-11892
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-118922022-03-04T06:02:58Z A systems study on Pelina Shoes Manufacturing Jimenez, Ramon Enrique Angelo D. Salvador, Nicolette Roxanne G. Sindiong, Rafael B. Pelina Shoes Manufacturing has been in the operations since 1978. Presently, it already has three customers in the Philippines namely Ferretti, Mario D Boro and Rusty Lopez. The system was conducted in Marikina City, Metro Manila. Data gathering was done on the different parts of the system namely placements, persons, raw materials, information, method, equipment, environment and performance. After documenting and discussing the present system, the strengths, weaknesses, opportunities and threats (SWOT) were identified, Through WOT-SURG analysis the main problem was determined. It was found out that the shoe manufacturing company is facing a huge problem with regards to the rejects of the company. According to the data collected from July 2009 to July 2010, the company experienced a 4.70% rate which deviates from the standard of 2%. In the problem analysis section, the initial cause and effect diagram was constructed for the reject problem of the company. Causes were identified and validated using pictures, tallies and observation of the shoe manufacturing company's operations through a Time and Motion Study. Here are the listed final causes of the problem which were identified using a Pareto Analysis. •Workers do not follow SOP •Lack of Grecco Adhesives •Damaged Raw Materials •Poor delivery to next internal customer •No Quality Control on raw materials •Poor training of sewers. Different solutions were made to further reduce the reject rate of the company. Listed below are the proposed solutions for the root causes identified following solutions. The following solutions were selected through the Kepner-Tregoe Decision Analysis: •Quality Checklist •Quality Training Program In order to reduce the reject rate of the employees, a quality checklist and training program should be provided to all employees of Pelina Shoes Manufacturing. The quality checklist will include detailed specifications of each of the ten (10) processes of the production line of sandals and step-ins. The quality checklist will incur an investment cost of Php 42,350.00 and an annual cost of Php 41,598,50. The quality checklist is expected to generate an amount totaling to Php 117,474.00. In addition, a quality training program will be implemented in order to improve the performance and quality control skills of the worker. The quality training program will incur an investment cost of Php 30,000.00 and an annual cost Php 46,750.00. The quality checklist is expected to generate an amount of totaling to Php 372,896.00. The total annual cost will amount to Php 88,348.50 which results to an annual net benefit of Php 490,370.00. The computed Net Present Value (NPV) of the proposed solutions equaled to Php 1,622,955.16. The payback period was computed to be 3 months. 2011-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/11247 Bachelor's Theses English Animo Repository Shoe industry--Philippines Engineering Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Shoe industry--Philippines
Engineering
Industrial Engineering
spellingShingle Shoe industry--Philippines
Engineering
Industrial Engineering
Jimenez, Ramon Enrique Angelo D.
Salvador, Nicolette Roxanne G.
Sindiong, Rafael B.
A systems study on Pelina Shoes Manufacturing
description Pelina Shoes Manufacturing has been in the operations since 1978. Presently, it already has three customers in the Philippines namely Ferretti, Mario D Boro and Rusty Lopez. The system was conducted in Marikina City, Metro Manila. Data gathering was done on the different parts of the system namely placements, persons, raw materials, information, method, equipment, environment and performance. After documenting and discussing the present system, the strengths, weaknesses, opportunities and threats (SWOT) were identified, Through WOT-SURG analysis the main problem was determined. It was found out that the shoe manufacturing company is facing a huge problem with regards to the rejects of the company. According to the data collected from July 2009 to July 2010, the company experienced a 4.70% rate which deviates from the standard of 2%. In the problem analysis section, the initial cause and effect diagram was constructed for the reject problem of the company. Causes were identified and validated using pictures, tallies and observation of the shoe manufacturing company's operations through a Time and Motion Study. Here are the listed final causes of the problem which were identified using a Pareto Analysis. •Workers do not follow SOP •Lack of Grecco Adhesives •Damaged Raw Materials •Poor delivery to next internal customer •No Quality Control on raw materials •Poor training of sewers. Different solutions were made to further reduce the reject rate of the company. Listed below are the proposed solutions for the root causes identified following solutions. The following solutions were selected through the Kepner-Tregoe Decision Analysis: •Quality Checklist •Quality Training Program In order to reduce the reject rate of the employees, a quality checklist and training program should be provided to all employees of Pelina Shoes Manufacturing. The quality checklist will include detailed specifications of each of the ten (10) processes of the production line of sandals and step-ins. The quality checklist will incur an investment cost of Php 42,350.00 and an annual cost of Php 41,598,50. The quality checklist is expected to generate an amount totaling to Php 117,474.00. In addition, a quality training program will be implemented in order to improve the performance and quality control skills of the worker. The quality training program will incur an investment cost of Php 30,000.00 and an annual cost Php 46,750.00. The quality checklist is expected to generate an amount of totaling to Php 372,896.00. The total annual cost will amount to Php 88,348.50 which results to an annual net benefit of Php 490,370.00. The computed Net Present Value (NPV) of the proposed solutions equaled to Php 1,622,955.16. The payback period was computed to be 3 months.
format text
author Jimenez, Ramon Enrique Angelo D.
Salvador, Nicolette Roxanne G.
Sindiong, Rafael B.
author_facet Jimenez, Ramon Enrique Angelo D.
Salvador, Nicolette Roxanne G.
Sindiong, Rafael B.
author_sort Jimenez, Ramon Enrique Angelo D.
title A systems study on Pelina Shoes Manufacturing
title_short A systems study on Pelina Shoes Manufacturing
title_full A systems study on Pelina Shoes Manufacturing
title_fullStr A systems study on Pelina Shoes Manufacturing
title_full_unstemmed A systems study on Pelina Shoes Manufacturing
title_sort systems study on pelina shoes manufacturing
publisher Animo Repository
publishDate 2011
url https://animorepository.dlsu.edu.ph/etd_bachelors/11247
_version_ 1772834926348992512