A system study on the production department of Philippine Paper Mills Inc. (PPMI)

Philippine Paper Mills Incorporated (PPMI) started its operations in 1951 in #570 H. Lopez St., Tondo, Manila. It is one of the pioneering company in the paperboard industry. During the 50's and 60's, PPMI was the leading manufacturer of paperboards in the country. For the year 1995, the c...

Full description

Saved in:
Bibliographic Details
Main Authors: Bacareza, Cromwell, Legaspi, Avel Christopher, Ty, Erle Leander
Format: text
Language:English
Published: Animo Repository 1997
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/11262
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-11907
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-119072022-03-05T02:19:12Z A system study on the production department of Philippine Paper Mills Inc. (PPMI) Bacareza, Cromwell Legaspi, Avel Christopher Ty, Erle Leander Philippine Paper Mills Incorporated (PPMI) started its operations in 1951 in #570 H. Lopez St., Tondo, Manila. It is one of the pioneering company in the paperboard industry. During the 50's and 60's, PPMI was the leading manufacturer of paperboards in the country. For the year 1995, the company lost P 899,793.00 in opportunity cost due to lost production time. They suffered a total 95978 minutes of lost production time or an average of 7998.167 minutes monthly. In terms of production, the company was not able to produce 1199.724 MT for 1995 or an average of 99.977 MT monthly. After deliberating on the possible causes of the problem, the proponents found out that it was the machine which is causing the majority of this. To remedy this, it was proposed that the most critical parts and sections of the machine should be replaced and rehabilitated. The option of buying a new machine or a second hand machine was not considered since it would be out of the company's budget and would waste the other sources of the company. To complement the solution, a maintenance policy was also adopted. It was arrived at that a preventive maintenance policy is appropriate and should be scheduled four times a month . In doing this, the company would have an NPV of P 9,285,337.86 after only four years. Simulating the proposed system proved that the production would yield 3 MT greater than the present system and thereby decreasing the lost production time by more than 50%. 1997-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/11262 Bachelor's Theses English Animo Repository Philippine Paper Mills Incorporated Paper industry--Philippines Production management Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Philippine Paper Mills Incorporated
Paper industry--Philippines
Production management
Industrial Engineering
spellingShingle Philippine Paper Mills Incorporated
Paper industry--Philippines
Production management
Industrial Engineering
Bacareza, Cromwell
Legaspi, Avel Christopher
Ty, Erle Leander
A system study on the production department of Philippine Paper Mills Inc. (PPMI)
description Philippine Paper Mills Incorporated (PPMI) started its operations in 1951 in #570 H. Lopez St., Tondo, Manila. It is one of the pioneering company in the paperboard industry. During the 50's and 60's, PPMI was the leading manufacturer of paperboards in the country. For the year 1995, the company lost P 899,793.00 in opportunity cost due to lost production time. They suffered a total 95978 minutes of lost production time or an average of 7998.167 minutes monthly. In terms of production, the company was not able to produce 1199.724 MT for 1995 or an average of 99.977 MT monthly. After deliberating on the possible causes of the problem, the proponents found out that it was the machine which is causing the majority of this. To remedy this, it was proposed that the most critical parts and sections of the machine should be replaced and rehabilitated. The option of buying a new machine or a second hand machine was not considered since it would be out of the company's budget and would waste the other sources of the company. To complement the solution, a maintenance policy was also adopted. It was arrived at that a preventive maintenance policy is appropriate and should be scheduled four times a month . In doing this, the company would have an NPV of P 9,285,337.86 after only four years. Simulating the proposed system proved that the production would yield 3 MT greater than the present system and thereby decreasing the lost production time by more than 50%.
format text
author Bacareza, Cromwell
Legaspi, Avel Christopher
Ty, Erle Leander
author_facet Bacareza, Cromwell
Legaspi, Avel Christopher
Ty, Erle Leander
author_sort Bacareza, Cromwell
title A system study on the production department of Philippine Paper Mills Inc. (PPMI)
title_short A system study on the production department of Philippine Paper Mills Inc. (PPMI)
title_full A system study on the production department of Philippine Paper Mills Inc. (PPMI)
title_fullStr A system study on the production department of Philippine Paper Mills Inc. (PPMI)
title_full_unstemmed A system study on the production department of Philippine Paper Mills Inc. (PPMI)
title_sort system study on the production department of philippine paper mills inc. (ppmi)
publisher Animo Repository
publishDate 1997
url https://animorepository.dlsu.edu.ph/etd_bachelors/11262
_version_ 1772835023198617600